UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1980 [PAGE 726]

Caption: Board of Trustees Minutes - 1980
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 726 of 744] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



UNIVERSITY OF ILLINOIS Peoria-Tazewell Pathology Group, S.C., contracts, 14, 270, 650 Pepper Construction Company, contract, 226 increase, 652 Percival Farm (Urbana), easement, gas service, extension, 155 Periodicals, sponsored, rules and regulations, contained in General Rules Concerning University Organization and Procedure, amendment of University Statutes, approved, 351 Perkm-Elmer Corporation, Physical Electronics Industries Division, spectrometer system, purchase, escrow account, established, 318 Pesavento, W. J., appointment, 299 Peshkin, A. J., member of Center for Advanced Study, 216 Pest control, contract, Chicago Circle, Library* Building, 311 Peter, A. P., member of advisory committee, 432 Peterman, W. A., appointment, 510 Peters, J. W., and Sons, Inc., contract, 569 Petersen, A. B., appointment, 149 Petersen, G., member of advisory board, 559 Petersen, I. J., member ol advisory board, 559 member of advisory committee, 391 Peterson, C. L., member of advisory committee, 49 Peterson, D. R., appointment, 530 Peterson, G., introduction, 632 Peterson, J. L., appointment, 397 Peterson, L. M-, member of committee to study consolidation of Chicago campuses, 555 Petry, C. A., & Sons, Inc., contract, 226 Petry Roofing, Inc., contract, 621 Pezalla, P. D., appointment, 52 Pharmacognosy and Horticultural Drug Station (Lisle;, contracts, animal housing facility, replacement of air conditioning and ventilation system, air conditioning work, 189 construction work, general, 189 electrical work, 189 ventilation work, 189 Pharmacy, College of (Medical Center), acting dean, appointment, 580 advisory committee, appointments, 95, 431 contract, cooling system, extension, 157 degrees, conferred, 32, 330, 331, 667, 668, 669 Doctor of Pharmacy, tuition rate, approved, 149 name, changed from College of Pharmacy Building 307 Pharmacy, College of, South Building (Medical Center), contracts, architectural services, 592 Pharmacy; Department of (Medical Center), organization, change from headship to chairpersonship, not approved, 436 Pharmacy Building (Medical Center), contracts, air conditioning work, 112 ventilation work, 112 Pharmacy Building, College of (Medical Center) , name, changed to College of Pharmacy, 307 Pharmacy fee, Chicago Circle, reduction, 221 Pharmacy fees, See also Hospital-medical-surgical fees Phelps, L. A., appointment, 434 Philip, E. L., appointment, 530 Phillips, C. G., appointment, 303 Phillips, D. S., appointment, 396 Phillips, R. H., appointment, 183 Phillips Swager Associates, contracts, 464 Philosophy, Department of (Chicago Circle), chairperson, appointment, 604 Philosophy, Department of (Urbana), chairperson, apoointment, 639 Physical and Chemical Research, Institute of. See also Rikagaku Kenkyusho (RIKEN)

715

Physical Education, Department of (Chicago Circle), head, appointment, 299 Physical Education, Teacher Education in (Urbana), minor, undergraduate, revision, 403 Physical Education Building (Chicago Circle), contracts, basement offices, construction work, general, 410 gymnasium floor repairs, 75 roofing work, repairs, 320 Physical Electronics Industries Division, PerkinElmer Corporation, spectrometer system, purchase, escrow account, established, 318 Physical facility services, contracts, Medical Center, Metropolitan Chicago Group of Affiliated Hospitals, 15 Peoria School of Medicine, 15 Rockford School of Medicine, 15 Physical Medicine & Rehabilitation, Institute of, contracts, 14, 269 Physical Plant Department (Chicago campuses), contracts, consulting services, data processing requirements study and systems implementation plan, 405 data processing system, general design, 537 Physical Plant Department (Chicago Circle). contracts, PT-40 Phantom tubes, 367 Physical Plant Department (Medical Center). lease, warehouse, 282 Physical Therapy, Department of (Medical Center), head, appointment, 59, 300 Physics, teacher education in (Urbana). major, undergraduate, revised, 535 Physics Research Laboratory (Urbana), name, changed to Nuclear Physics Laboratory, 534 Physikalische und Theoretische Chemie der Technischen Universitat Munchen, Institut fur, contract, change, 114 Physiology monitoring system (Medical Center), contract, cabling installation, 542 Picur, R. D., appointment, 9 Pierpont, R. H., member of advisory council, 47 Pike County, farmland, West Central Illinois Agricultural Research and Demonstration Center, conveyance of title to John Wood Community College, 277 option to purchase farm, West Central Illinois Agricultural Research and Demonstration Center, 130 Pines, D., member of Center for Advanced Study, 124 Piping work, contracts, Chicago Circle, minor building alterations, repairs and new construction, 654 minor remodeling and new construction, 128 previous action of board rescinded, 128 Medical Center, Building 923, replace steam line, 368 Building 937, replace steam line, 368 Building 938, replace steam line, 368 chilled water facility, 407 rejection of bids, 407 Damen Avenue, replace condensate line, 157, 279 replace steam line, 279, 320 Drug and Horticultural Center, water tank installation, 112 minor building alterations, repairs and new construction, 654 minor remodeling and new construction, 128 previous action of board rescinded. 128 904 Building, remove and replace underground condensate line. 229 Polk Street, replace condensate line, 253, 279 replace steam line, 320