1980]

UNIVERSITY OF ILLINOIS

587

Dollar Increase $ 98 340 Percent Increase 9.98 24.01

1979-80 Delta (room & board) French (room & board) $ 982 1 416

Proposed 1980-81 $1 080 1 756

N O T E : $200 of the French House increase is due to reducing the capacity by two spaces (from eighteen to sixteen). • Faculty Housing — 62 units Rate increase of 10 percent ranging from $19 to $31 per month per dwelling. T h e rates currently in effect at the Urbana campus compare favorably with those charged by the Big T e n universities in that they are slightly below the midpoint of the range. Given available information on increases projected at other Big Ten campuses next year, Urbana-Champaign rates should continue to approximate the midpoint of this range. The vice president for administration concurs in these recommendations. I recommend approval.

On motion of Mr. Neal, these recommendations were approved.

By consensus the board agreed that one roll call vote would be taken and considered the roll call vote on each of the next six items. The recommendations were individually discussed but acted upon at one time.

Contracts for Remodeling in the Women's Residence Hall, Medical Center

(11) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for remodeling the lower level of the Women's Residence Hall at the Medical Center campus to accommodate the Campus Services Housing Offices, the award in each case being to the low bidder on the base bid. Division I — General Wm. J. Scown Building Co., Chicago Division II — Plumbing Fenco Piping Co., Inc., Park Ridge Division I I I — Heating & Air Conditioning Independent Mechanical Industries, Inc., Chicago Division I V — Ventilation Admiral Heating and Ventilating, Inc., Hillside Division V — Electrical Public Electric Construction Company, Inc., Chicago Division V I — Elevator Colley Elevator Company, Chicago Total

$179 950 6 697 9 740 2 315 34 426 28 244

$261 372

It is further recommended that (1) all contracts other than the contract for general work and elevator work be assigned to the contractor for general work (making the total of its contract $233,128); and (2) an agreement be entered into with Wm. J. Scown Building Co., Chicago, for the assignment of the contracts for these divisions of work. The assignment fee has been included in the base bid. O n July 18, 1979, the trustees approved the employment of an architect/ engineer for projects to improve student life at the campus. This is the first of a series of such projects. Funds are available from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N.