UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1980 [PAGE 580]

Caption: Board of Trustees Minutes - 1980
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 580 of 744] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1980]

UNIVERSITY OF ILLINOIS

569

Group, Inc., be assigned responsibility for overall supervision of the Medical Service Plan office on a day to day basis and continue efforts to increase cash receipts. These services are within the scope of the original contract which provides for payment on an hourly basis and appropriate expense reimbursements. Expenditures under the contract are currently limited to not exceed $41,850 and it is recommended that this authorization be increased by an additional $52,900 to accommodate the proposed additional work thereunder. Funds are available in the operating budget of the Abraham Lincoln School of Medicine. T h e vice president for administration concurs. I recommend approval.

Chicago Circle Pavilion, Chicago Circle Campus

(26) The president of the University, with the concurrence of appropriate administrative officers, recommends award of the following construction contracts for the Pavilion at the Chicago Circle campus, the award in each case being to the low bidders on their base bids plus acceptance of the indicated alternate bids: Bid Package 11 1. Elevator: Gallaher & Speck, Chicago 2. Sub Soil Plumbing: G. F. Connelly Co., Inc., Chicago Bid Package III 1. General Work: 2. Cast in Place Concrete: Pora Construction Company, Des Plaines 3. Precast Concrete: J. W. Peters and Sons, Inc., Burlington, Wisconsin 4. Structural Steel, Trusses and Joists: Mississippi Valley Structural Steel Co., Decatur 5. Metal Deck and Studs: SR Industries Corporation, Schmidt Iron Works Division, Schaumburg 6. Ventilation and Air Conditioning: F. E. Moran, Inc., Northbrook (Base Bid less deductive alternate # 3 ) 7. Plumbing: Fullerton Plumbing & Heating Co., Inc 8. Fire Protection: G. F. Connelly Co., Inc., Chicago 9. Electrical: Berwyn Electric Co., Chicago Total

$

35 600 11 925

2 551 000 970 000 1 077 000

109 800 539 400

267 333 10 824 692 816 $6" 265 698

Funds are available from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N. A schedule of the bids received has been filed with the secretary of the board for record. Bids for structural steel and metal deck and for cast-in-place concrete were previously received by the University on July 6, 1979, and July 12, 1979, respectively. The low bids received for these divisions of work exceeded the funds allocated to those phases of the project. Accordingly, the scope of the project was revised for rebidding. Pursuant to the provisions of Article I I , Section 4 (k) (2) of The General Rules Concerning University Organization and Procedure, the bids were rejected and the president reports their rejection.