Caption: Board of Trustees Minutes - 1980 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1980} UNIVERSITY OF I H J N O I S 567 Division III — Heat/Air/Temperature Dever Heating and Air ConBase Bid ditionlng Co., Urbana Alt. H I , H2 Division IV — Ventilation R. H. Bishop Company, Champaign Division V — Electrical Remco Electrical Corp., Champaign Total 1 605 5 190 6 795 Base Bid Alt. VI . . . , 8 545 3 315 " 23 407 739 " U 860 Base Bid Alt. E l , E2, E4, E5 24 146 $116 647 It is further recommended that: (1) all contracts, other than the contract for general work, be assigned to the contractor for general work making the total of its contract $116,647; and (2) an agreement be entered into with JohnsonStirewalt Construction Company for the assignment of the other contracts. Funds are available from the proceeds of the sale of Auxiliary Facilities System Revenue Bonds, Series N. A schedule of the bids received has been filed with the secretary of the board for record. Contracts for Elevator Addition, McKinley Health Center, Urbana (22) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for installation of an elevator at the McKinley Health Center, Urbana, the award in each case being to the low bidder on its base bid plus acceptance of the alternatives indicated: Division I — General Dean Evans Co., Champaign Base Bid $176 729 Add. Alt. G2, G3, G4, G5 9 000 $185 729 Division II — Plumbing Paul H. McWilliams & Sans. Base Bid 8 840 Inc., Champaign 3 840 Division III — Heating, Piping, R. H. Bishop Company, Champaign Division IV— Ventilation R. H. Bishop Company, Champaign Division V — Electrical Remco Electrical Corp., Champaign Total Air Refrigeration Base Bid Add. Alt. HPR-1 Distribution Base Bid Add. Alt. VI 3 535 2 845 6 380 4 990 685 " 15 080 403 15 483 $222 107 5 675 Base Bid Add. Alt. E l
| |