1980]

UNIVERSITY OF ILLINOIS

543

cable, conduit, electrical power, and other miscellaneous work, to provide a physiology monitoring system in the new University of Illinois Hospital at the Medical Center campus. Funds for this project are available from the Hospital Income Fund. (The following bids for this project were received on February 14, 1980: Mid-America Electric Co., Palatine $67 758 Midwest Interstate Electrical Construction Co., Chicago $79 950 Arlington Electrical Construction Co., Inc., Arlington Heights $86 450 G & M Electrical Contractors Co., Chicago $88 000) O n motion of Dr. Donoghue, the preceding items were approved by the following vote: Aye, Dr. Donoghue, Mr. Forsyth, Mr. Hahn, M r . Howard, Mr. Lenz, Mr. Neal, Mrs. Shepherd, Mr. Stone, Mr. Velasquez; no, none; absent, Governor Thompson. (Mr. H a h n asked to be recorded as not voting on item 25.) ( T h e student advisory vote was: Aye, Mr. Grady, Mr. Sobotka; no, none; absent, Miss Wyncott.)

Report of Purchases Approved by the Vice President for Administration

(34) The vice president for administration also submitted a report of purchases approved by him on recommendation of the directors of purchases in amounts of $12,500 to $15,000. A copy of this report is filed with the secretary.

The Comptroller's M o n t h l y Report of Contracts Executed

(35) The comptroller's monthly report of contracts executed was presented. Chicago Circle Contract Change Order

With Whom G & M Electrical Contractors Co. Total Purpose Cost-plus contract • Install Series I computer cable in University tunnels on Chicago Circle ii campus

Amount to Be Paid (>y the University

$ 15 000

15 000

Medical Center Contract Change Orders

With Whom Wm. J. Scown Building Co. Purpose Cost-plus contract — Perform general work to Install raised floor and cable duct for electrical cables in room B-8, Campus Health Services Perform roof repairs on the Biological Resources Laboratory

Amount to Be Paid by the University S 22 271

Frank Staar & Sons, Inc. Total

21 522 $ 43 793

Urbana-Champaign New Contracts

With Whom Boone County, Illinois Brookhaven National Laboratory BNL 496089-S Purpose Perform a geologic study of Boone and Winnebago Counties Perform studies on the stability of computational methods for thermo-hydraulic models used in reactor safety analysis Amount to Be Paid to the University % 24 122

7 000