226

BOARD OF TRUSTEES

[March 21

Contract for Indoor Pool Restoration, Intramural—Physical Education Building, Urbana

(21) T h e president of the University, with the concurrence of appropriate administrative officers, recommends award of a contract for $161,300 to C. A. Petry & Sons, Inc., Champaign, the low bidder on its base bid plus additive alternate two, to resurface the floor and clean the sidewalls of the indoor pool of the I n t r a m u r a l Physical Education Building at the Urbana campus. This project is to arrest an ongoing maintenance problem. When the building was constructed in 1971, budgetary restrictions prevented the installation of a ceramic tile floor to match the sidewalls of the pool. Consequently, the bottom was surfaced with a marble dust plaster. This material has proved unsatisfactory because of its separation from the pool's subbase. Funds are available from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N. (A schedule of the bids received is filed with the secretary of the board for record.) T h e s t u d e n t a d v i s o r y v o t e w a s : Aye, Miss K o o p e r , M r . S o b o t k a , M r . Watson; no, none. O n m o t i o n of M r . V e l a s q u e z , this c o n t r a c t w a s a w a r d e d b y t h e foll o w i n g v o t e : Aye, D r . D o n o g h u e , M r . F o r s y t h , M r . H a h n , M r . H o w a r d , Mr. Lenz, M r . Neal, Mrs. Shepherd, M r . Stone, M r . Velasquez; no, n o n e ; absent, Governor T h o m p s o n .

Employment of Construction Manager for the Pavilion, Chicago Circle

(22) In October 1978, the Board of Trustees authorized the employment of Skidmore, Owings & Merrill, Chicago, for professional architectural/engineering services for the Pavilion project at the Chicago Circle campus. In February, the design of the Pavilion was approved by the Committee on Buildings and Grounds. T o expedite the completion of the project, the president of the University, with the concurrence of appropriate administrative officers, recommends that phased construction procedures be utilized on the Pavilion, and further recommends the employment of Pepper Construction Co., Chicago, for professional construction management services for this project through the completion of construction at a lump sum fee of $318,000. Funds are available from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N. T h e student advisory vote w a s : Aye, Miss K o o p e r , M r . Sobotka, M r . Watson; no, none. O n m o t i o n of M r s . S h e p h e r d , t h e s e r e c o m m e n d a t i o n s w e r e a p p r o v e d b y t h e following v o t e : Aye, D r . D o n o g h u e , M r . F o r s y t h , M r . H o w a r d , M r . Lenz, M r . Neal, Mrs. Shepherd, M r . Stone, M r . Velasquez; no, n o n e ; a b s e n t , G o v e r n o r T h o m p s o n . M r . H a h n a s k e d t o b e r e c o r d e d as n o t voting.

Lease of Space for Library, Urbana

(23) The president of the University, with the concurrence of appropriate administrative officers, recommends entering into an agreement to lease 12,258 net square feet of warehouse space to provide storage for the University Library at Urbana. T h e space would be used to store materials that are not frequently used. It is heated and air conditioned and has a loading dock and other facilities which make it desirable for the intended use.