UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1980 [PAGE 124]

Caption: Board of Trustees Minutes - 1980
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 124 of 744] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



114

BOARD OF T R U S T E E S

[October 20

Amount to Be Paid to the University % 21 000

With Whom United States Air Force F41689-76-C-0179 United States Army: DACW72-7S-C-0005 DAMD17-75-C-5006 United States Department of Energy EE-77-S^02-4329 E W 78-S-21-8214 EY-76-S-05-4162 United States Department of Health, Education, and Welfare N01-HD-5-2849 United States Department of the Interior G0264010 United States Environmental Protection Agency: R803-652-02 R805588-01 United States Navy: N00014-75-C-0904 N00014-75-C-0942

Purpose Provide P L A T O I V terminals and services to Chanute Air Force Base Grain commodity flow study Post treatment of R O permeates from Army wastewaters Determine if high C O j levels act synergistically with S O J in several native and crop species Evaluate the results of the eastern gas shales project in the Illinois Basin Trameeship p r o g r a m for graduate students in nuclear engineering Detect ovulation by a steroid indicator

154 850

14 980 46 640 10 000 14 800 48 549

Study the importance of airborne particulate matter to the transport of radon in mine atmospheres

62 445

Effect of moisture regimen on solid waste sterilization Experimental management plan for the Ohio River Basin energy study M u l t i v a r i a t e behavior models Investigate a t o m transfer reactions in electrochemical systems Conduct a study of electroorganic synthesis reactions

18 938 300 000 59 681 8 216 7 000 12 100 S 812 708

Amount to Be Paid by the University 10 117

University of Chicago, Argonne National Laboratory 31-109-38-4003 Provide P L A T O I V terminals and services University of Nebraska PI-65 Total

Change Orders

With Whom Institut fur Physikalische und Theoretische Chemie der Technischen Univeraitat M u n c h e n (subcontract under N S F C H E 77-08372) Teknektron, Inc. (subcontract under US EPA R-805588) Total

Purpose Provide consulting services

Experimental management plan for the Ohio River Basin energy study %

180 002 190 119

Contract Work Order

With Whom Downtown Electric Total Purpose Cost-plus contract — Electrical work to connect computer equipment in the Library Building Amount to Be Paid by the University % 8 500 j 8 500

Amount to be paid to the University: Medical Center Urbana-Champaign Total Amount to be paid by the University: Chicago Circle Medical Center Urbana-Champaign Toted

Summary

% 142 377 2 227 020 |2~369 397 18 114 345 |~478 { 361 969 606 936

This report was received for record.