Caption: Board of Trustees Minutes - 1980 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
114 BOARD OF T R U S T E E S [October 20 Amount to Be Paid to the University % 21 000 With Whom United States Air Force F41689-76-C-0179 United States Army: DACW72-7S-C-0005 DAMD17-75-C-5006 United States Department of Energy EE-77-S^02-4329 E W 78-S-21-8214 EY-76-S-05-4162 United States Department of Health, Education, and Welfare N01-HD-5-2849 United States Department of the Interior G0264010 United States Environmental Protection Agency: R803-652-02 R805588-01 United States Navy: N00014-75-C-0904 N00014-75-C-0942 Purpose Provide P L A T O I V terminals and services to Chanute Air Force Base Grain commodity flow study Post treatment of R O permeates from Army wastewaters Determine if high C O j levels act synergistically with S O J in several native and crop species Evaluate the results of the eastern gas shales project in the Illinois Basin Trameeship p r o g r a m for graduate students in nuclear engineering Detect ovulation by a steroid indicator 154 850 14 980 46 640 10 000 14 800 48 549 Study the importance of airborne particulate matter to the transport of radon in mine atmospheres 62 445 Effect of moisture regimen on solid waste sterilization Experimental management plan for the Ohio River Basin energy study M u l t i v a r i a t e behavior models Investigate a t o m transfer reactions in electrochemical systems Conduct a study of electroorganic synthesis reactions 18 938 300 000 59 681 8 216 7 000 12 100 S 812 708 Amount to Be Paid by the University 10 117 University of Chicago, Argonne National Laboratory 31-109-38-4003 Provide P L A T O I V terminals and services University of Nebraska PI-65 Total Change Orders With Whom Institut fur Physikalische und Theoretische Chemie der Technischen Univeraitat M u n c h e n (subcontract under N S F C H E 77-08372) Teknektron, Inc. (subcontract under US EPA R-805588) Total Purpose Provide consulting services Experimental management plan for the Ohio River Basin energy study % 180 002 190 119 Contract Work Order With Whom Downtown Electric Total Purpose Cost-plus contract — Electrical work to connect computer equipment in the Library Building Amount to Be Paid by the University % 8 500 j 8 500 Amount to be paid to the University: Medical Center Urbana-Champaign Total Amount to be paid by the University: Chicago Circle Medical Center Urbana-Champaign Toted Summary % 142 377 2 227 020 |2~369 397 18 114 345 |~478 { 361 969 606 936 This report was received for record.
|