UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1980 [PAGE 119]

Caption: Board of Trustees Minutes - 1980
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 119 of 744] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1978]

Specialized consultants Ice Rink Sound System Acoustics Total

UNIVERSITY OF ILLINOIS

109

40 10 6 $96 000 000 000 000

Employment of Architect/Engineer for Capital Development Board Projects, FY 1979, Chicago Circle

(24) T h e president of the University, with the concurrence of appropriate administrative officers, recommends that the Board of Trustees request the Capital Development Board to employ Skidmore, Owings and Merrill, Chicago, to provide the professional services listed below, for roof resurfacing. The fee for each project will be negotiated in accordance with standard procedures of the Capital Development Board. Chicago Circle Space Realignment, Renewal, and Replacement Architecture and Art Laboratory Science and Engineering Laboratory

$ 60 000 370 000

Funds for the employment of the professional firm have been appropriated to the Capital Development Board for FY 1979.

Employment of Engineer for Chilled Water Facility for Certain Buildings, Medical Center

(25) T h e president of the University, with the concurrence of appropriate administrative officers, recommends the employment of Gritschke & Cloke, Inc., Chicago, for the required professional services to provide chilled water facilities for the existing Men's Residence Hall, Chicago Illini Union, Women's Residence Hall, and the proposed Single Student Residence and Chicago Illini Union and Recreation Facility at the Medical Center campus. T h e fee is estimated at a level up to $50,000 which will provide for the services through construction. Authorized reimbursements for the project are estimated to be $5,000. Funds are available from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N.

Employment of Engineer for Chilled Water Facility for Certain Union Addition, Medical Center

(26) The president of the University, with the concurrence of appropriate administrative officers, recommends the employment of Loebl, Schlossman & Hackl, Chicago, for the professional architectural and engineering services required for an addition to the Chicago Illini Union at the Medical Center campus. T h e estimated fee for the firm's services through construction is at a level up to $275,000, plus reimbursements authorized by the University, the latter estimated to be $40,000. Funds are available from the proceeds of the sale of University of Illinois Auxiliary Facilities System Revenue Bonds, Series N.

Employment of Architect/Engineer for Addition and Remodeling, Illini Union Bookstore, Urbana

(27) The president of the University, with the concurrence of appropriate administrative officers, recommends the employment of Richardson, Severns, Scheeler, Greene & Associates, Inc., Champaign, to provide the required professional architectural and engineering services, through the completion of construction of an