397

Development Board to employ the engineer as indicated below for a "Build Illinois" capital project for Fiscal Year 1994 at the Chicago campus. The professional fee for the firm employed will be negotiated by the Capital Development Board in accordance with its procedure. Project Electrical Service Upgrade, College of Pharmacy Project Budget Professional Finn Recommended $335 000 Doyen & Associates, Inc., Chicago

Funds for the employment of the professional firm have been appropriated to the Capital Development Board for FY 1994.

On motion of Ms. Reese, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Mr. Malone, Mr. Mathew, Mr. Rose; no, none.)

Employment of Architect/Engineer for Chilled Water Master Plans, Chicago and Urbana

(26) The president of the University, with the concurrence of the appropriate University officers, recommends the employment of GLHN Architects and Engineers, Tucson, Arizona, for the professional architectural and engineering services required for development of chilled water master plans for the Urbana and Chicago-East campuses. The firm's fee for the professional services required for these chilled water master plans will be determined on an hourly basis not to exceed a total of $168,400, plus reimbursables not to exceed $21,000. The chilled water master plans developed will provide a framework for the organized implementation of a long-term chilled water plan at the two campuses. (Chilled water systems provide the primary source of air conditioning at both the Chicago and Urbana campuses.) Components of the study will include collection of data pertaining to the condition and operation of existing facilities, review of energy sources and uses for chilled water production, identification of operating and capacity problems of existing systems, development of a model of system economics, strategy review for solution options, and a long-range plan for solution implementation. The final product of the studies will include computer software that will be used to model the campuses' systems for future changes. A schedule of the hourly rates for this contract and the firms responding to this process have been filed with the secretary of the board for record. Funds are available from the institutional funds budgets of the Operation and Maintenance Division of the Urbana campus and Physical Plant Division of the Chicago campus.

On motion of Ms. Reese, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Mr. Malone, Mr. Mathew, Mr. Rose; no, none.)