UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1994 [PAGE 300]

Caption: Board of Trustees Minutes - 1994
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 300 of 692] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



288

BOARD OF TRUSTEES

[May 11

eight new laboratory areas with adjacent support spaces at an additional cost of $1,700,000. Recently, the campus requested that additional funds be used to develop unfinished space for an auditorium/lecture hall (as originally programmed) in the building. To complete the interior construction of the 180-seat auditorium/lecture hall will cost $500,000. State statutes provide that the Capital Development Board and the University may contract with each other and other parties on the design and construction of any project to be constructed on University property. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the University now contract with the Capital Development Board in order to finance the work described above at an additional cost of $500,000. University funds are available from the Institutional Funds budget of the Chicago campus.

On motion of Dr. Gindorf, this recommendation was approved by the following vote: Aye, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Employment of Architect/Engineer for Fourth Floor Remodeling, Newmark Civil Engineering Laboratory, Urbana

(25) The president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of Ralph Hahn and Associates, Springfield, for the professional architectural and engineering services required for the fourth floor remodeling of the Newmark Civil Engineering Laboratory at the Urbana campus. The firm's fee for the professional services required through the construction phase, including on-site observation and reimbursable expenses, will be $219,200. The $2,030,000 project will reconfigure approximately 15,400 square feet of laboratories and ancillary space on the fourth floor for Environmental Engineering. The proposed remodeling will include new partitions, flooring, laboratory casework, fume hoods, laboratory services, mechanical systems, lighting, and electrical upgrades. Funds are available from a National Science Foundation grant, private gift funds, and the Institutional Funds Operating Budget of the College of Engineering.

On motion of Dr. Gindorf, this recommendation was approved by the following vote: Aye, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Lease of Space, College of Medicine, Rockford

(26) The chancellor at Chicago recommends that the comptroller be authorized to execute a lease with SwedishAmerican Realty Corporation for leased space located in the SwedishAmerican Professional Building (1221 East State Street) in Rockford. The lease is for the initial term of December 1, 1995, to November 30, 1998, and includes two one-year renewal terms.