UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1994 [PAGE 268]

Caption: Board of Trustees Minutes - 1994
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 268 of 692] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



256

BOARD OF TRUSTEES

[April 13

the following vote: Aye, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar, Mrs. Gravenhorst. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contract for Security Fencing, Chicago

(16) The chancellor at Chicago, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $564,061 to Midwest Fence Corporation, Chicago, the lowest responsible bidder, on its base bid and Additive Alternates #1 and #2 for the installation of security fencing south of Roosevelt Road and for supplying security iron fencing for later installation at various other locations on the east campus, Chicago. The fencing for the south campus is in accordance with the Intergovernmental Agreement entered into with the City of Chicago. It will provide security in parking areas and replace walls in several areas where the walls are deteriorating. The project consists of site preparation, fabrication, and installation of security fencing for the south campus. Alternate #1 and Alternate #2 are for fabrication and supply of security fencing for various other locations on campus. Locations for the security fence included in the bid are shown in the attachments. A schedule of the bids received and copies of the attachments have been filed with the secretary of the board for record. Funding for the project is available from the State Capital Bond and State Appropriated Operating Funds and from Operating Funds of the Campus Parking Division. I concur.

On motion of Mrs. Calder, this recommendation was approved by the following vote: Aye, Mrs. Calder, Mr. Engelbrecht, Dr. Gindorf, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar, Mrs. Gravenhorst. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contract for Replacing the Entrance Plaza Paving for the Pavilion and Improving the Arthington Mall for the Chicago lllini Union, Chicago

(17) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $344,862 to G. F. Structures Corporation, Chicago, the lowest responsible bidder, on the basis of its base bid ($363,742) plus acceptance of deductive alternates #3, #6, #14, and #16 ($18,880). The project consists of two portions of work; namely, replacement of paving at the Pavilion and improvements to the Arthington Mall at the Chicago lllini Union. The original concrete paving at the main entrance of the Pavilion building was installed when the building was constructed in 1981 and has deteriorated from weathering and pedestrian traffic. Similarly, the pedestrian and vehicular paving that is located immediately south of the main entrance of the Chicago lllini Union building has also deteriorated. Both portions of this project will require demolition of the existing paving, regrading of the site, installation of a new storm drainage system, new site lighting, new paving for sidewalks and service driveways, and new landscaping.