1995]

UNIVERSITY OF ILLINOIS

227

the following vote: Aye, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contract, Remodel Biologic Resources Laboratory Holding Facility, Betatron Facility, Chicago

(11) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $1,030,000 to Goebolt Construction Company, Inc., Lincolnwood, the lowest responsible bidder, on the basis of its base bid, for remodeling of the former Betatron Facility to provide a Biologic Resources Laboratory holding facility for the Department of Obstetrics/ Gynecology at the Chicago campus. The project consists of the following: complete gutting of the former Betatron Facility, removal of an unused cobalt unit, and remodeling and expanding that facility in order to provide a Biologic Resources Laboratory holding facility of approximately 2,000 square feet for the Department of Obstetrics/Gynecology in the College of Medicine. Funds are available from the Restricted Funds Operating Budget of the College of Medicine. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Dr. Gindorf, this recommendation was approved by the following vote: Aye, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contract to Remodel Anatomy Laboratories, College of Medicine West, Chicago

(12) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $372,000 to Joseph Construction Company, Lynwood, the lowest responsible bidder, on the basis of its base bid of $353,000 plus acceptance of alternate #1 in the amount of $19,000,' for remodeling the seventh, eighth, ninth, and tenth floors of the College of Medicine West building for the Anatomy and Cell Biology Department of the College of Medicine at the Chicago campus. The project consists of remodeling 11,700 nasf of existing anatomy laboratories, lockers, and restrooms. Additionally, 1,000 nasf of work room space per floor on the eighth, ninth, and tenth floors will be included. Work will include the demolition and removal of existing equipment and case work, renovation of room finishes, installation of new stainless steel casework and sinks, and installation of equipment, as well as modifications to existing mechanical, plumbing, and electrical systems. Funds are available from the Restricted Funds Operating Budget of the College of Medicine. A schedule of the bids received has been filed with the secretary of the board for record.

Alternate #1 — Add remodeling of Restroom 704 to comply with ADA requirements.