1995]

UNIVERSITY OF ILLINOIS

181

Funds are available from the Auxiliary Facilities System Series 1993 Revenue Bond issue. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Dr. Gindorf, this recommendation was approved by the following vote: Aye, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Contract, Window Replacement, Goodwin and Green Apartments, Urbana

(8) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract in the amount of $457,922 to Replacement Window Systems, Inc., Markham, the lowest responsible bidder, on the basis of its base bid ($449,756) plus alternate #G-1 ($8,166), for the window replacement project for the Goodwin and Green Apartments at the Urbana campus. (Alternate #1 is to provide insulated glass injected with Argon gas and to seal the unit.) The Goodwin and Green Apartments were constructed in 1950 and 1951. The original windows installed are single-glazed, double-hung windows. The proposed $500,000 window replacement project consists of replacing the existing windows with new energy-efficient insulated units. Funds are available from the Auxiliary Facilities System FY 1995 R&R and Housing Division Funds. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Dr. Gindorf, this recommendation was approved by the following vote: Aye, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.)

Increase in Project Budget; and Increase in Architectural/Engineering Contract, Office of Admissions and Records Building, Urbana

(9) On October 20, 1994, the board approved the revised project budget of $5,859,797 for the Office of Admissions and Records Building at the Urbana campus. The project includes planning, construction, utilities, site development, and landscaping. The 29,000 gsf (16,475 nasf) facility will house the Office of Admissions and Records, currently located in three buildings on campus. The proposed threestory building will be located south and east of the Levis Faculty Center on Gregory Street; and the scope of the project will include steam and electric utility extensions, site development, and building construction. The utility infrastructure extensions will include new chilled water lines, steam and condensate mains, and electrical distribution center upgrades, which will also accommodate future facilities to be located in the same area. Subsequently, at the request of the Urbana campus, upgrades to the appearance