1992]

UNIVERSITY OF ILLINOIS

65

the university counsel to take such action as may be necessary to acquire privately owned land through acquisition or the power of eminent domain should negotiations to purchase such property fail or if the University is unable to identify and negotiate a purchase agreement with the owner(s). The area covered by this authorization is the area bounded by Morgan Street, Roosevelt Road, Union Street, and the railroad right-of-way at 16th Street, as set forth in the attached map.1 Finally, it is recommended that the Executive Committee be authorized to take such further action as may be necessary to effectuate this resolution.

On motion of Mr. Boyle, these recommendations were approved and the resolution was adopted by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese; no, none; absent, Governor Edgar, Mrs. Shepherd. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Employment of Architect/Engineer, Roger Adams Laboratory, Urbana

(27) The Department of Chemical Engineering proposes to update its building space in Roger Adams Laboratory to serve as an advanced technology facility for modern chemical engineering education. The initial project is the first two phases of a proposed ten-phase project to update the Department of Chemical Engineering space at Roger Adams Laboratory. The proposed $1.0 million project includes planning, construction, and utilities. In order to proceed with the project, it is necessary to employ an architectural and engineering firm to provide the required professional services. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the firm of BLDD Architects, Decatur, be employed for the professional services required through the bidding phase of the project. The firm's fee for the program verification phase of all ten phases will be on an hourly basis, the total not to exceed $31,000. The firm's fee for the schematic design through bidding phases of this project (phases I and II) will be a fixed fee of $71,280 plus authorized reimbursements estimated to be $8,000. Gift funds are available through the University of Illinois Foundation. A schedule of the firm's hourly rates has been filed with the secretary of the board for record.

On motion of Mr. Boyle, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese; no, none; absent, Governor Edgar, Mrs. Shepherd. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Lease of Space, 850 West Jackson Building, Chicago

(28) The chancellor at Chicago recommends that the University contract with LaSalle National Bank, Chicago, as trustee, to lease 8,919 square feet in the 850 W.Jackson Building (suite #510), Chicago, for the period November 16,1992, through November 15, 1995. The University would have an option to renew this lease for two additional one-year periods, subject to approval by the Board of Trustees. The facility will

1

A copy of the map is filed with the secretary of the board for record.