1993]

UNIVERSITY OF ILLINOIS

401

construction estimate, and modifications to bid documents and additional printing costs as a result of a building tenant's last-minute notification that it would not be vacating the building until March 1, 1994, or later. The additional costs to the architect amount to $328,500. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the contract with Solomon, Cordwell, Buenz 8c Associates, Inc., be increased by $328,500 for the work described above. Funds are available from the proceeds of the Series 1993 Auxiliary Revenue Bond Issue and institutional funds of the Chicago campus.

On motion of Mr. Boyle, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. HufF, Mr. Riley; no, none.)

Increase in Contracts, Campus Bookstore and Office Building, Urbana

(23) On January 15 and February 12, 1993, the board authorized the award of contracts for the construction of the campus bookstore and office building at the Urbana campus. Refinement of the design of the tenant space on the upper floors of the building has resulted in additional work to be performed by the contractors for the project. The work includes additional interior partitions, lighting fixtures, electrical service, data outlets, heating, ventilating, air conditioning, and floor covering. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the following contracts be increased by the amounts indicated below for the work as described. Contractor Williams Brothers Construction, Inc., Peoria (general) Nogle 8c Black Mechanical, Inc., Urbana (plumbing and sprinkler) Reliable Plumbing 8c Heating Company, Savoy (heating, refrigeration, and temperature control) Reliable Plumbing 8c Heating Company, Savoy (ventilation and air distribution) Potter Electric Service, Inc., Urbana (electrical) Increase $67 574 586 7 980 5 352 700

Funds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond Issue and Auxiliary Facilities System Plant Funds.

On motion of Mr. Boyle, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. HufF, Mr. Riley; no, none.)

Delegation of Authority to Award Contracts, Installation of Variable Speed Fan Controls, Ten Buildings, Urbana

(24) An Energy 2000 program is in progress on the Urbana campus to install energy conservation equipment using Fiscal Year 1994 campus funds. The design for these