UNIVERSITY OF ILLINOIS

399

Contracts, Remodeling, Mechanical Engineering Laboratory HA, Urbana

(20) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for remodeling the first floor of the Mechanical Engineering Laboratory IIA at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates. Division I — General Tri-R Development Company, Champaign

Base Bid Alt. 1 Alt. 2 Alt. 3 Alt. 5

$154 8 30 29 3

700 457 900 200 700 $226 957

Division II — Plumbing A 8c R Mechanical Contractors, Inc., . . . Base Bid Alt. 2 Alt. 3 Alt. 4 Division III — Heating, Refrigeration, and Temperature Control A & R Mechanical Contractors, Inc., Urbana 27 400 2 150 800 3 000 33 350

. . . Base Bid Alt. 2 Alt. 3

90 220 11 171 4 867 106 258

Division IV — Ventilation and Air Distribution A & R Mechanical Contractors, Inc., Urbana

Base Bid Alt. 2 Alt. 3

59 795 11 600 4 995 76 390

Division V — Electrical Bodine Electric of Decatur, Inc., Champaign

Base Bid Alt. 2 Alt. 3 Alt. 4

76 165 9 950 4 515 890 91 520

Total $534 475 This project will provide research laboratories in the fields of thermal sciences and thermal systems as well as other related research fields under development which need to be accommodated. The work consists of interior remodeling of approximately 6,700 nasf on the first floor of Mechanical Engineering Laboratory IIA to divide the open space into