1993]

UNIVERSITY OF ILLINOIS

353

Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Increase in Contract, Paulina Street Parking Structure, Chicago

(19) On September 10, 1992, the board approved an increase to the project engineer's contract for additional on-site engineering representation provided by Construction Technology Laboratories, Inc., Skokie, for the $3.6 million concrete repair project for the Paulina Street parking structure located at the corner of Paulina and Taylor Streets at the Chicago campus. The nature of the repair work involving the existing structure's post-tensioned cables slowed the construction process. As a result, the construction duration was extended by approximately 16 weeks, which extended the full-time, on-site representation as well as the engineer's administrative and in-house engineering services. The additional cost of these services is $81,596. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the contract with Construction Technology Laboratories, Inc., Skokie, be increased by $81,596 for the services described above. Funds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond Issue.

On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Employment of Architect/Engineer, Interior Furnishings, Fixtures, and Equipment, Student Services Building, Chicago

(20) The president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of Solomon, Cordwell, Buenz & Associates, Inc., Chicago, for the professional architectural and engineering services required for the interior furnishings, fixtures, and equipment in the Student Services Building at the Chicago campus. The firm's fee for the professional services required through the construction phase of the project will be a fixed fee of $243,800, including reimbursable expenses. The project consists of providing interior design services for approximately 133,000 square feet in the Student Services Building, including new and existing furniture. Areas include approximately 25 student services related departments, two atria, and circulation space. Funds are available from the proceeds of the Series 1993 Auxiliary Revenue Bond issue and institutional funds of the Chicago campus.

On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)