EXTRACTED TEXT FROM PAGE:



1992]

UNIVERSITY OF ILLINOIS

445

2. Reinforce the commitment of the college's faculty and hospital management to the plan and its strategies by involving them in the definition of the implementation program. T h e Tiber Group will provide technical support and advice on selected topics as needed throughout this process. T h e firm has superior knowledge of the Chicago health care market and has previously assisted initial phases of our planning process. T h e work will begin on January 16, 1992, and conclude on June 30, 1992, at a total cost not to exceed $395,000. Funds are available in the operating budgets of the hospital and the College of Medicine. T h e vice president for academic affairs recommends approval. I concur.

On motion of Mrs. Shepherd, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Contracts, Student Residence and Commons Addition, Chicago

(15) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for the construction of a 73,000 square foot, 362-bed student housing addition to the existing Student Residence and Commons Building located near the corner of Harrison and Halsted Streets at the Chicago campus. T h e award in each case is to the lowest responsible bidder on its base bid plus acceptance of the alternates indicated. Division I — General Work Bulley & Andrews, Chicago Base Alt. Alt. Alt. Alt. Alt. Alt. Alt. Alt. Bid $4 297 894 G-l 71 254 G-2 134 535 G-4 25 250 G-5.2.... 110 875 G-6 6 050 G-7 18 900 G-8 37 775 G-9 -0$4 702 533 Division II — Plumbing Work R. C. Plumbing, Inc., Calumet Park Base Bid Alt. P-2 Alt. P-9 $ 469 069 500 1 200 470 769 Division III — Heating, Piping, Refrigeration, and Temperature Control Work International Piping Systems, Inc., Schiller Park Base Bid Alt. H-2 Alt. H-9

$

696 000 2 400 28 000 726 400