1991]

UNIVERSITY OF ILLINOIS

367

for the design and bidding phases of the project will be a fixed fee of $97,000 plus reimbursements estimated to be $6,000. A schedule of the firm's hourly rates has been filed with the secretary of the board for record. Funds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond issue.

On motion of Mrs. Gravenhorst, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Employment of Architect/Engineer, Armory Track Replacement, Urbana

(24) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of Severns, Reid & Associates, Inc., Champaign, for the professional architectural and engineering services required for the replacement of the track located in the Armory building and provide for telescoping bleachers and for improved control of pedestrian accessibility to the arena floor. T h e firm's fee for the professional services required for the design and bidding phases of the project will be a fixed fee of $63,000 plus reimbursements estimated to be $4,000. Funds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond issue.

On motion of Mrs. Gravenhorst, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Employment of Engineer, Deck Repair, Campus Parking Structures, Urbana

(25) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of Carl Walker Engineers, Inc., Kalamazoo, Michigan, for the professional engineering services required for the $1.5 million project to repair the decks (approximately 634 parking spaces on approximately 175,000 gross square feet of deck area) in two campus parking structures (C7 and C10) located in the block bounded by Fifth, Sixth, Daniel, and John Streets, Champaign. T h e firm's compensation for the professional services required for the design and bidding phases will be a fixed fee of $57,000 plus reimbursements estimated to be $3,000. Funds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond issue.