270

BOARD OF TRUSTEES

[May 9

( T h e student advisory vote was: Aye, Mr. Forbes, Ms. Kelly; no, none.) Contract, Parking Lot Renovation, Orchard Place, Urbana (16) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $124,099 to Cross Construction, Urbana, the low bidder, on its base bid, for the renovation of the parking lot at Orchard Place at the Urbana campus. T h e work consists of demolition of curbs and sidewalks and construction of curbs and gutters, sidewalks, pavement, and bituminous surfacing of parking lot and access drives. Funds are available from the Auxiliary Facilities System Replacement and Reserve Account. A schedule of the bids received has been filed with the secretary of the board for record. O n motion of Dr. Bacon, this r e c o m m e n d a t i o n was approved by t h e following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Grabowski, Mrs. G r a v e n h o r s t , Mr. L a m o n t , Ms. Reese, Mr. Wolff; no, n o n e ; absent, Mr. Boyle, G o v e r n o r Edgar, Mrs. S h e p h e r d . ( T h e student advisory vote was: Aye, Mr. Forbes, Ms. Kelly; n o , none.) Employment of Architect/Engineer, Law Building Addition and Remodeling, Urbana (17) In November 1990, the firm of O'Donnell, Wicklund, Pigozzi and Peterson, Architects, Inc., Deerfield, was employed for the program definition/concept development phase for the Law Building addition and remodeling project at the Urbana campus. T h e program definition/concept development of the proposed facility is complete, and it is now proposed that planning for the project proceed. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that O'Donnell, Wicklund, Pigozzi and Peterson, Architects, Inc., Deerfield, be employed for the professional services required for the schematic design through the bidding phase of the project. T h e professional services required through the receipt of bids will be at a fixed fee of $525,741, plus authorized reimbursements estimated to be $84,000. T h e proposed $10.0 million project consists of a 50,000 gross square feet addition to the existing facility and approximately 21,000 gross square feet of remodeled area in the existing Law Building. It is anticipated that bids will be received in April 1992. Funds for this contract are available from private gift funds through the University of Illinois Foundation. O n motion of Dr. Bacon, this r e c o m m e n d a t i o n was approved by t h e following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Grabowski, Mrs. G r a v e n h o r s t , Mr. L a m o n t , Ms. Reese, Mr. Wolff; no, n o n e ; absent, Mr. Boyle, G o v e r n o r Edgar, Mrs. S h e p h e r d . ( T h e student advisory vote was: Aye, Mr. Forbes, Ms. Kelly; no, none.)