UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1908 [PAGE 543]

Caption: Board of Trustees Minutes - 1908
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 543 of 776] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1908]

PEOCEEDINGS OF THE BOAED OF TRUSTEES. TUNNEL TO.PHYSIOS BUILDING.

,

515

On recommendation of Supervising Architect, Professor White, it was voted that $500.00 or as much thereof as may be necessary, be appropriated from the appropriation for the Physics building for the tunnel and steam connection to the building and that the Supervising Architect be authorized to have the work done.

LIGHTNING RODS ON THE AUDITORIUM AND KEPAIRS.

On recommendation of Supervising Architect, Professor White, and on motion of Mr. Lehman, it was voted that the bids of Carl Barjohr of $137.00 for rods on the Auditorium and repairs on the rods on other buildings be accepted.

REPAIRS IN HOUSEHOLD SCIENCE DEPARTMENT.

It was voted to appropriate $150.00 from funds of the Agricultural College for repairs in the household science department.

BIDS FOR FLORIOULTURAL GREENHOUSES.

The Supervising Architect, Professor White, presented the following schedule of bids for the heating, plumbing and gas, and the electrical work on the Moriculture greenhouse.

Work. Reliable Johnson P l u m b i n g and G a s . Reliable Johnson Bidder. $2,554 00 2,212 00 284 00 [ $294 25 10 25 348 00 335 00 [ 349 00 14 00 Conduit. O p e n wire B a t e m a n - P e n t e r Co 259 80 151 00 W a y Electric Co 350 00 195 00 Marrs T a n n e r Co 394 70 254 00 Champaign G a s & Elec. Supply Co .. 286 00 195 00 Total P l u m b i n g and Heating C o . . Bros P l u m b i n g and Heating C o . . Bros L o w Bid.

$2,212 00 294 25

Electrical

259 80

$2,766 05

I t was voted to accept the bid of Johnson Brothers for the heating, $2,212.00; of the Reliable Plumbing and Heating Company for the pluniibing and gas, $294.25; and of Bateman-Penter Company for the electrical work, $259.80.

AUDITORIUM.

On motion of Mrs. Evans it was ordered that a settlement be made on account of the Auditorium with Mr. Blackall, English Brothers, and the Champaign Gas and Electrical Supply Company.