Caption: UIS History 1969-1995 (Sangamon State Univ) This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
f&*n ,;neroy Conservation ^• m B DD9UI ! H $102,600 f L cc« B«dget: H m i I •010-020 I 8 >cd/Englneer: ^ ^ ^ ^ A* " ^ . i n a B Vania Engineering ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ K Summary: Conversion of existing perimeter roadway lighting to high pressure sodium and interconnection of the Honeywell Delta 1000 energy management system to the HVAC units I the metal buddings ( A - L ). ^ ^ 5 ( s ) : Carmean Electric, Inc. Construction Start Date: October 3, 1980 Completion: August 1981 (substantial); October 3, 1981 (final) Fiscal Yean 1981 Project: Building "K" Safety Improvements Total Project Budget: $143,000 CDB Project Number: 823-010-021 Architect/Engineer: Graham, O'Shea and Hyde, Architects, Inc. Project Summary: Included extending fire-rated walls to the ceiling in wet laboratory areas t S ^ S ^ water piping, additional fire detectors, an emergency alarm system, and a new animal vivarium. Contractor(s): Lo ortsj. P l u m b ing General - Alzina Construction Co. I Baker Plumbing and Heating Co. Ventilating - Schmidt Bros., Inc. Electric - Mansfield Electric Co. Construction Start Date: May 1981 Completion: November 10, 1981 (substantial); August 18, 1982 (final) 89
|