|
| |
Caption: Board of Trustees Minutes - 1978 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
UNIVERSITY OF ILLINOIS Conrad Associates East, Construction Research and Development, Inc., contract, 191 Construction Engineering Research Laboratory, See United States Army, Construction Engineering Research Laboratory Construction Research and Development, Inc., Conrad Associates East, contract, 191 Construction work, general, contracts, Champaign, parking facilities, Fifth Street, property at 908 South, change, 141 Sixth Street, property at 907 South, change, 113 Chicago, Taylor Street, property at 1919 West, remodeling, 486 Chicago Circle, concrete repairs, change ; 36 Education and Communications Building, wall repairs, change, 168 Parking Structure No. 2, 446 roof repairs, changes, 36 stairway repairs, change, 36 University Hall, cashier's area enclosure, change, 168 waterproofing, change, 36 wheelchair ramp installation, change, 36 Medical Center, Administrative Office Building, partition ad carpeting installation, 420 window wall repairs, change, 37 Chicago Ulini Union, remodeling, change, 79 Dentistry - Medicine - Pharmacy Building, First U»it, light resetting, change, 168 First Unit, refurbishing, 420 Second Unit, autopsy amphitheater, remodeling, change, 37 Graduate College relocation, remodeling, change, 79 temperature-controlled room, change, 37 tuckpointing repairs, 420 Eye and Ear Infirmary, motility waiting area, change, 193 General Hospital, general medical clinic, air conditioning system, change, 79 Illinois Surgical Institute Building, window installation, change, 289 Old Ulini Union, floor repairs, 361 parking structure, increase, 71, 312, 447 Pharmacy Building, remodeling of basement, 539 Public Health Building, window renovation, change, 37 roof repairs, general, change, 168 site work, Hermitage Avenue between West Polk and West Taylor, 592 Parking Lot E, 592 Staff Apartments, window painting, change, 37 Student Residence Hall main kitchen, remodeling, Phase II, 235 ventilation system, alterations, 136 tuckpointing. change, 214 University Hospital, mail bag receiving and shipping conveyor installation, change, 37 Peoria School of Medicine, recreational facilities, 357 rejection of bid, 451 Rockford School of Medicine, Rock ton Community Health Center, remodeling, 314 Urbana, Abbott Power Plant, roofing, change. 141 Aerospace Laboratory, masonry restoration^ change, 113 Bliss Drive, driveway resurfacing, change, 141 Carle Drive, driveway resurfacing, change, 141 Coordinated Science Laboratory, masonry restoration, change, 113 697 Construction work, cont'd driver training site building, change, 290 Geological Survey Laboratory, masonry restoration, change, 113 roof replacement, change, 113 Intramural-Physical Education Building, floor repairs, 322 change, 170 Large Animal Clinic, litigation, suit concerning payment for materials and labor, employment of special counsel, litigation, 116 Memorial Stadium, track repairs, change, 81 minor remodeling and new construction, 286 Morrill Hall, masonry restoration, change, 113 old Small Animal Clinic, demolition, change, 141 parking facilities, Lincoln and California Avenues, property at southwest corner, change, 81 Physical Plant Service Building, storage shed, change, 38 Physical Plant Service Storage Building, extension, 241 remodeling, change, 215 Physics Research Laboratory, addition, 72 remodeling, 72 President's House, masonry work, change, 113 south laundry building, roofing, change, 215 gift, Medical Center, Eye Research Building, negotiations, authorization, 23 Student (Single) Residence, Medical Center, rejection of bids, 509 revised project cost, 589 tennis courts^ Peoria School of Medicine campus, 669 Construction work, special, contracts, Urbana, Physics Research Laboratory, addition, 72 remodeling, 72 Consulting services, contracts, Chicago, Physical Plant, management alternatives, 402 Chicago Circle Center, Great Circle Hall, food service, 191 Medical Center, building use and condition survey, 449 campus planning, 449 previous action of board rescinded, 449 replacement hospital, construction document review, renewal, 401 equipment planning, increase, 237 health facilities development, renewal, 24, 357 interior design, 213, 510 Medical Center Steam Company, fuel change study, 450 University of Illinois-Willard Airport, air carrier apron security lighting, engineering services, 164 engineering services, 487 runway improvements, engineering services, 164 Urbana Abbott Power Plant, conversion of boilers, 510 Assembly Hall, roof waterproofing, architectural services, 262 engineering services, 262 Office of Business Affairs, productivity improvement program, 486 Operation and Maintenance Division, productivity improvement program, 486 Continental Illinois National Bank and Trust Co., managing underwri ter, for advance re-funding bonds, 566 member of Underwriting Management Group, for planned underwriting for the advance re-funding bond issue, 566
| |