UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1978 [PAGE 583]

Caption: Board of Trustees Minutes - 1978
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 583 of 756] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



Suggested Project Priorities for Campus Life Auxiliary Enterprises S

Chicago Circle Medical Center UrbanaChampaign

Priority 1 2

Current Indebtedness Intramural-Physical Education Building at Urbana-Champaign Memorial Stadium at Urbana-Champaign Subtotal

J 6 073 000 1 278 073 ( 7 351 073) J J 2 100 000 1 600 000

000 000 000 000

$1 737 490

3 4 5 6 7 8 9 10 11 12 13 14 15 16

Remodeling, Equipment Replacement, and Completion of Current Structures Urbana-Champaign — Memorial Stadium, weatherproofing Urbana-Champaign —• Assembly Hall, roof resurfacing 80 Chicago Circle Center —revolving doors. 5 20 Chicago Circle Center — recreation lighting 40 Chicago Circle Center — swimming pool locker room floor 50 Chicago Circle Center — second floor locker room conversion Medical Center — housing and union, equipment replacement and facility renewal Urbana-Champaign — McKinley Health Center, roof and heating, ventilation, and air conditioning , Urbana-Champaign —Housing Division, roof repair Urbana-Champaign — Housing Division, kitchen and safety improvements Urbana-Champaign— Illini Union, kitchen equipment Urbana-Champaign — Intramural-Physical Education, patio and indoor pool repair Chicago Circle Center—Great Circle Hall, completion 1 700 Chicago Circle Center — enclose first floor, High Rise Building 100 Subtotal, remodeling, equipment, replacement, and completion of current structures New Projects Medical Center — Union Addition and recreation facilities Chicago Circle — Pavilion Urbana-Champaign — IHini Union Bookstore, improvement Chicago Circle — outdoor playing fields Medical Center — outdoor recreation facilities Urbana-Champaign — McKinley Health Center, elevator Subtotal, new projects Total

110 000 745 000 625 000 180 000 290 000 000 000

(J 1 990 000) (SI 737 490) ( 5 650 000) J

17 18 19 20 21 22

«5 550 000

S 7 500 000

600 000 620 000 195 000

S 8 120 000 $10 110 000

S5 745 000 J7 482 490

140 000 J 740 000 J13 741 073