Repository: UIHistories Project: Board of Trustees Minutes - 1956 [PAGE 84]

Caption: Board of Trustees Minutes - 1956
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 84 of 1665] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1954]

UNIVERSITY OF ILLINOIS

Amount to be Paid to the University $ 13 000 00 3 000 00 17 000 00 12 000 00 24 000 00 10 000 00 15 000 00 15 000 DO 59 800 00 Effective Date July 1, 1954 July 1, 1954 July 1. 1954 July i, 1954 July i, 1954 July 1, 1954 July 1, 1954 July 1, 1954 September 1, ]

8l

With Whom State of Illinois Division of Highways State of Illinois Division of Highways State of Illinois Division of Highways State of Illinois Division of Highways State of Illinois Division of Highways State of Illinois Division of Highways State of Illinois Division of Highways State of Illinois Division of Highways United States Air Force AF 33(6i6)-22i9 (two contracts— Stavid Engineering prime contractor and University of Illinois subcontractor) United States Army DA-11-022-ORD-33 United States Army DA-18-064-CML-2295 United States Army DA-18-108-CML-2963 United States Army DA-3 3-oi7-eng-222 United Stales Army DA-36-039-SC-42446 United States Army W-49-007-MD-496 United States Atomic Energy Commission Project No. 5 United States Atomic Energy Commission Project No. 10 United States Atomic Energy Commission Project No. 12 United States Atomic Energy Commission AT (1 i-i)-2,y6 United States Navy NObs-65790 Amendment No. 1 United States Navy Nonr-2.19(00)

Purpose Highway problems Hydraulics of flow at bridges Impact on highway bridges Lateral stability of retaining walls and abutments Prestressed reinforced concrete highway bridges Riveted and bolted structural joints Soil exploration and mapping Soil-aggregate mixtures for highway pavement Aircraft instrument displays

Compounds of high nitrogen content Synthesis of organic fluorine compounds Mechanism of couduction and transmission of the nerve impulse in muscles Structural design of reinforced conCrete box culverts Intensity of surface precipitation by radar instrumentation Cytology studies Intermolecular diffusion Synthesis and degradation of lactos in cell-free systems Metabolism of amino acids Aerosols Propagation of fractures in metals and analysis of crack starting Electrochemistry in liquid ammonia

25 000 00 15 400 00 8 592 00 1 500 oo1 45 322 00 14 125 00 16 140 00 9 936 00 1 808 00 16 400 00 40 000 00 74 721

July 1, 1954 April 30, 1954 December 29, June 3. 1954 May 24, 1954 July i, 1954 September I, 1954 July 1, 1954 July 1, 1954 September 1, 1954 January 1, 1955 June 29, 1954

953

Adjustments Made in 1952-53 Cost-Plus Contracts (Adjustments in projects authorized prior to July I, 1954)

With Whom Schroeder's (Ventilating) Purpose Engineering Research Laboratory fourth floor air conditioning $ Amount 228 I5 1 Dale June 22, 1954

Adjustments Made in 1953-54 Cost-Plus Contracts (Adjustments in projects authorized prior to July 1, 1954)

With Whom E. T. Drewitch (Plastering) E. C- Manthei (Consulting engineering service) Purpose Seven minor items: £175.97 deduct to $13.32 Veterinary Clinic Building $ Amount 184 751 500 00 Dale June, 1954 August 13, 1954

Adjustments Made in 1954-55 Cost-Plus Contracts

With Whom Harry F. Fisher (Plastering)

1

Purpose Twenty-four items: ?547-47 deduct to $4,539.00

Amount £10 778 49

Date July-August, 1954

This report was received for record.

Deduct.