|
| |
Caption: Board of Trustees Minutes - 1942 This is a reduced-resolution page image for fast online browsing.

EXTRACTED TEXT FROM PAGE:
1940J UNIVERSITY OF ILLINOIS In In Orthodontia Orthopaedics 97 W I L L I A M CHARLES STAFF, D.D.S., University of Louisville, 1934 P A U L HENDERSON DUBE, A.B., Ohio State University, 1931; M.D., W e s t e r n Re- serve University, 1935 In In In In EMIL DAVID LEVITIN, A.B., Bradley Pathology Pharmacology Physiology Psychiatry Polytechnic Institute, 1932; M.D., Rush M A X MALCOLM MONTGOMERY, B.S., State University of Iowa, 1927; M.D., 1931 MILDRED RANNEY JACKSON, B.S., Monmouth College, 1936; B.M., 1940 RAYMOND FRANKLIN SHEETS, A.B., Carthage College, 1936 Medical College, 1937 BIDS O N FOOD SERVICE EQUIPMENT FOR CHICAGO U N I O N BUILDING (2) The Director of the Physical Plant Department submits the accompanying schedule of bids received on kitchen and cafeteria service equipment for the Union Building for the Chicago Departments. H e recommends the award of the contract to the Stearnes Company, the lowest bidder, in the amount of $15,190, and approval of a change order in the amount of $1,639.65 covering certain deductions to bring the net contract within the funds budgeted for this equipment. BID SCHEDULE—KITCHEN AND CAFETERIA SERVICE EQUIPMENT STUDENT U N I O N , CHICAGO Alternate Proposal No. 2A Bidders No. 2 (Add) Duparquet. Inc., 225 N. Racine Ave., Chicago $15 651 $205 Southern Equipment Co., 5017 S. 38th St.. St. Louis 15 422 265 The Stearnes Co., 1333 S. Wabash Ave., Chicago 15 190 240 Alternate No. 2B {Deduct) $383 366 395 Proposal No. 2—Furnishing and installing all kitchen and cafeteria equipment, including refrigerator, cold pans, water cooler, ice cream cabinet, etc. Alternate No. 2A—In the event that intermediate and bottom shelf of open sections of cafeteria counters are made of stainless steel. Alternate No. 2B—In the event that stainless steel table tops in the dishwashing unit are changed to galvanized. COMBINED PROPOSAL M E N ' S RESIDENCE H A L L , URBANA, AND STUDENT UNION, CHICAGO Alternate Alternate Proposal No. IA No. iB No. 1 (Add) (Deduct) Duparquet, Inc. $31 594 $295 £853 The Stearnes Co 31 485 240 876 Proposal No. 1—For all kitchen and cafeteria equipment. Men's Residence Hall and Student Union. Alternate No. iA—In the event all cafeteria counter open shelving at Student Union is changed to stainless steel. Alternate No. 1B—In the event dishwashing tables are changed from stainless to galvanized steel. Director Havens commented on these bids. On motion of Mrs. Plumb, this contract was awarded as recommended. The Executive Committee adjourned. H. E. CUNNINGHAM HAROLD POGUE, Chairman Clerk Mrs. GLENN E. PLUMB
| |