370

BOARD OF TRUSTEES Range I Present Proposed Above 10 hours Above 2}4 units #40 00 #40 00 Above 8 hours

Above 2 units

[February 20

Range III Present Proposed Above 0 to 5 hours Above 0 to 1% units #25 00 #10 00 Above 0 to 4 hours Above 0 to 1 unit #20 00 #10 00

Semester Twelve-Week Summer Term (Institutes) Eight-Week Summer Session

Range II Present Proposed A bove 5 to 10 hours Above 1% to 2% units #30 00 #25 00 Above 4 to 8 hours Above 1 to 2 units #25 00 #20 00 Above 2% to 5 hours Above % to I'M. units #15 00 #13 00

#30 00

#30 00

Above 5 hours Above unit & #20 00

A bove 2

Above 0 to 2)4 hours Above 0 to % unit #10 00 # 5 00

#20 00

courses

Six-Week Winter Short Course in Agriculture and Home Economics #15 00

2 courses

1 course

#15 00

#15 00

#10 00

#10 00

? 5 00

Fee for noncredit registrations of students in residence for thesis research only: $10.00 a semester and $5.00 for the summer session, reduced from $15.00. It will be noted that the changes are in the direction of reducing the fee charged students registered for partial programs of work, many of whom — usually school teachers — commute to the campus for a single course. I concur.

On motion of Mr. Swain, the recommended changes were approved.

CONTRACT FOR SANITARY SEWER (10) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of contract to Cross Construction, Inc., Urbana, Illinois, the lowest bidder, for construction of a sanitary sewer to the new College of Education and College of Commerce buildings, and to other buildings in their area, at a total price of $58,936.30, being the amount of the base bid plus additive alternates for rerouting existing sewers to the new sewer and providing granular fill for that portion of the sewer under Taft Drive. Funds are available in the state capital appropriations to the University from the Universities Building Fund and have been released. Submitted herewith is a report from the Physical Plant Department on this project, including a schedule of the bids received, a copy of which is being filed with the Secretary of the Board for record. I concur. O n m o t i o n of M r . J o h n s t o n , t h i s c o n t r a c t w a s a w a r d e d , a s r e c o m mended, b y the following vote: Aye, M r . Clement, M r . Dilliard, Mr. Hughes, Mr. Johnston, Mr. Page, Mr. Pogue, Mr. Swain, Mrs. Watkins, M r . Williamson; no, n o n e ; absent, M r . K e r n e r . CONTRACTS FOR LANDSCAPING OF SITES OF NEW BUILDINGS AT URBANA-CHAMPA1GN (11) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of contracts for landscaping of areas of four new buildings recently constructed or now being completed on the Urbana-Champaign campus, the award in each case being to the lowest bidder: Twin City Landscape Service, Inc., Urbana, Illinois —• for complete landscape work in the Assembly Hall area $49 009 92 J. R. Ingels, an individual doing business as Henry Nurseries, Henry, Illinois — for complete landscaping at the Burnsides Research Laboratory, Health Service Addition to McKinley Hospital, and Physical Plant Service Building 10 977 09 Funds are available in the construction budgets of the four buildings. I concur.