Caption: Board of Trustees Minutes - 1970 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
722 BOARD OF TRUSTEES [December 17 Change Orders With Whom Simpson Construction Company Total Purpose Cost-plus contract —• general work: Medical Research Laboratory Amount to be Paid by the University $ S 905 3 8 905 Urbana-Champaign New Contracts Purpose Functional diagnosability and recovery from massive faults in digital systems Cognitive processes and systems Study on stabilizing a plasma by means of an external dynamic feedback loop Disinfection of sewage effluents With Whom National Aeronautics and Space Administration United States Air Force: AFOSR-70-1865 F33615-7O-C-1091 United States Department of the Interior Federal Water Pollution Control Administration 17060-DNU United States Department of State SCC-41045 Total Amount to be Paid to the University $ 26 228 97 975 36 600 University of Illinois Jazz Band tour of Russia and Poland J197 084 Change Orders With Whom Educational Products Information Exchange Institute Illinois State Library Institute of Boiler and Radiator Manufacturers United States Air Force: AF-AFOSR-328-67 AF 33(615)-S248 United States Army; DA-49-193-MD-2909 DAAB07-69-C-0097 United States Atomic Energy Commission AT(U-1)1018 United States Department of the Interior Office of Water Resources Research 14-01-0001-1632 United States Navy: N-00014-67-A-0305-0001 N-00O14-67-A-0305-OO02 Total Purpose Development and testing of instruments and techniques for gathering information about school settings Library research and reference services project Investigations, experimental, and research work relating to the heating and ventilating of houses and buildings Theory of solids and condensed matter Low density plasmas with gaseous lasers Determination of free bromine in water Study and investigation toward design of a direction finder system for MF-HF-VHF ranges Pattern recognition and data handling problems arising in the analysis of bubble chamber photographs of high-energy particle events Operations of Water Resources Center Amount to be Paid to the University $ 12 686 ioo ooo 37 000 36 220 20 300 26 225 129 866 100 000 100 000 Kinetic theory of strong shock waves by solution of the Boltzmann equation Investigations of radio direction finding techniques over broad bands of frequencies to obtain accurate information on intercepted signals 30 000 170 000 Change Orders Purpose Cost-plus contract—general work: East Chemistry Mining and Metallurgy Talbot Laboratory Cost-plus contract — electrical work: Mining and Metallurgy J762 297 Amount to be Paid by the University $ 5 500 5 800 5 800 8 700 With Whom Dean Evans Company Remco Electrical Total $ 25 800
|