996

BOARD OF TRUSTEES

[June 22

dividend. It is estimated that continuing the policy the fourth year in the above manner will save approximately $250 in the cost of this insurance for the fourth year. T h e Purchasing Agent, the Director of the Physical Plant Department, and the Comptroller recommend acceptance of the Lumbermen's Mutual Casualty Company's offer to extend this insurance for the fourth year ending July 31,1947, and that an order be placed with them at an estimated net of $2,300, chargeable to the Physical Plant Operation and Maintenance appropriation. I concur and recommend approval.

On motion of Mr. Davis, this offer was accepted as recommended. The Board considered the following matters in executive session.

POST-WAR UNIVERSITY BUILDING PROGRAM (16) The University Building Committee has been working on a post-war University building program for several months. A preliminary report of its work was made by the Chairman to the Board of Trustees on April 8, 1044. Subsequently, pursuant to authorization of the Board of Trustees, the Committee had two formal conferences with representatives of the Illinois State Post-War Planning Commission—one at Urbana and one in Chicago—as well as informal consultations. As reported to the Board of Trustees on June 1, a formal request presenting the University's building and other capital improvement needs should be submitted to the Commission on or before July 1, 1944. T h e University Building Committee recommends the following projects: S U M M A R Y OF E S T I M A T E S

URBANA-CHAMPAIGN Estimate

1. New buildings for present teaching and research programs (See " / cos^ Schedule A) $ 9 718 000 2. Residence halls 3 000 000 3. Remodeling and modernization of present buildings (See Schedule B) 3 129 000 4. Utilities and grounds improvements (See Schedule C) I 457 000 5. Equipment: (a) For new building projects in Item 1 $1 026 000 (b) For remodeling projects in Items 3 and 6 . . . . 125 000 (c) For betatron and power generator 1 500 000 2 651 000 6. Faculty-Graduate Student Center 500 000 7. Betatron Laboratory Building 200 000 8. Land for new buildings in Items 1 and 2 (See Schedule D) 230 000 9. New buildings for Veterinary College (tentative) 1 500 000 Total ?22 385 000 Note: Provision for a Sports (or Physical and Health Education) Building is not included in the above estimates because it has not been studied by the Committee and because the Committee understood that t h e application for an allotment of funds for this building may be presented to the Illinois State Post-War Planning Commission and t o the General Assembly separately from the University's building program. The parties interested in promoting this project desire to present the proposal directly to the Board of Trustees at some meeting in the near future.

CHICAGO

1. 2. 3. 4. 5.

Additions to the General Hospital Atmospheric Research Land Acquisition Power Plant and Utilities Visual Education Building Total Grand Total, Urbana-Champaign and Chicago

$ 3 650 250 75° I 865 1 100 $ 7 615 S30 000

000 000 00 ° 000 000 000 000