Caption: Board of Trustees Minutes - 1944 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
19431 UNIVERSITY OF ILLINOIS 609 D A D D H B u r e a u of Salaries and Wages Educational Research 1. W . S. Monroe, Director (See Education) 2. , Research Assistant 3. Beulah J. Houston, Junior Clerk-Stenographer (C.S.) . . . Total, Salaries 4. Wages Total, Salaries and Wages Expense and Equipment General Departmental Expense Travel Equipment Total, Expense and Equipment Total, Bureau of Educational Research $ 6 000 I 800 1380 (9 180) 150 (9 330) 225 75 5o (350) 9 080 $ C O L L E G E O F ENGINEERING AND E N G I N E E R I N G EXPERIMENT STATION Summary 5 f l W j Qlher College Administration Airport Operation Ceramic Engineering Civil Engineering Electrical Engineering General Engineering Drawing Mechanical Engineering Mining and Metallurgical Engineering Physics Theoretical and Applied Mechanics Total, College Station Administration Ceramic Engineering Chemical Engineering Civil Engineering Electrical Engineering Mechanical Engineering Mining and Metallurgical Engineering Physics Physics—Betatron Research Sewage Research Theoretical and Applied Mechanics Total, Station Grand Total, College and Station an d Wages Expense $14 920 $ 3 500 11 000 24 415 3 700 61 875 3 400 70 395 4 550 45 070 I 500 124 911 9 700 22 095 2 600 119 233 12 450 49 385 3 400 (532 299) (55 800) 600 945 295 760 090 424 375 800 275 100 170 834) 133 6 750 1 000 450 I 050 900 2 400 1 100 2 550 2 000 900 1 600 (20 700) $76 500 Total ?i8 420 11 000 28 115 65 275 74 945 46 570 134 611 24 695 131 683 52 785 (588 099) 23 350 5 945 8 745 22 810 16 4 8 21 10 18 5 1 8 2 28 (125 $658 10 20 6 4 990 824 475 350 10 275 3 000 29 770 (146 534) #734 633 E x p e n d a b l e Gift a n d E n d o w m e n t F u n d s Salaries Other Research: and Wages Expense Army Air Force—ceramic coatings for disposal systems $15 000 $10 000 Association of American Railroads and Carnegie Illinois Steel Company—rails investigations 10 500 500 Association of American Railroads—wheel loads and joint bar tests 8 000 2 000 Association of American Railroads; Bureau of Public Roads—tests of welded joints 5 000 3 500 Chicago Bridge and Iron Company—shock absorbing capacity of steel 2 000 400 Total $25 000 11 000 10 000 8 500 2 400
|