Caption: Board of Trustees Minutes - 1988 This is a reduced-resolution page image for fast online browsing.

EXTRACTED TEXT FROM PAGE:
Table 3 (continued) Priority 23 24 25 26 27 28 29 30 Build Project Nuclear Physics Lab. Addition Upgrade Campus Fire Alarm System . . . . Mechanical Engineering Building Remodeling C College of Business and Continuing Education Building UC Main Library Remodeling UC Outdoor Instructional/Recreational Facilities UC Pilot Training Facility UC Campus Police Building Illinois Requests' C / U C Repair and Renovation Program (Phase 3) UC Completion, Animal/Dairy Science Campus UC C UC Budget Category Plan. Util. Remd. Plan. Plan. Site Bldg./Util. Plan. FY 1988 Request $ 350.0 794.0 2 950.0 850.0 160.0 85.0 932.8 90.0 Cumulative University $51959.0 52 753.0 55 703.0 56 553.0 56 713.0 56 798.0 57 730.8 57 820.8 24 177.0 32 536.0 Cost (Dollars in Chicago $23 327.0 32 376.0 e n Thousands) Urbana $29 426.0 i 0 32 621.0 33 553.8 33 643.8 if z o 55 P r Remd. Bldg./Remd. 7 834.0 1 998.1 1 Because this project serves the needs of both the Chicago and Urbana-Champaign campuses, the cost may be applied on an equal basis to both. For the purpose of this tabic, the entire project cost will be included under Chicago. ' Build Illinois projects are non-prioritized.
|