UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1932 [PAGE 279]

Caption: Board of Trustees Minutes - 1932
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 279 of 726] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



I931]

UNIVERSITY O F ILLINOIS

2-77

By the Purchasing Agent Machine Shop Equipment (see letter) Water bath for R o o m 229 (estimated) By the Architects Extras on General Contract Mastic tile in Class Rooms Book Cases in Dean's Office Fence Moving Departments Extras on Plumbing Contract Gas outlet in R o o m 5 Gas outlet third floor Toilet paper fixtures Gas Stove Extras on Wiring Contract Outlets for directional signs Moving outlets in R o o m 5 Moving outlets in 110 and 140.. . Laboratory furniture changes Library Lighting Fixtures Telephone Company charges Animal Cages Feed bins Sterilizer for Animal Cages

$1 700 00 500 00 J2 200 00

$ 830 00 364 00 3 000 00 2 000 00 6 194 00 20 00 36 00 100 00 100 00 256 00 2117 10 00 20 00 '

Si 17 5 000 00 850 00 350 00 3 756 00 145 00 300 00 $19 102 17 Balance for service connections, boiler, etc. £34 291 89 Contract recommended to the Board of Trustees for award on bids received by L. A. Snider Engineering Service, Inc., at 3:00 p.m. Friday, June 12, for service connections and equipment to medical buildings, as follows: Davis Construction Company $32 787 jap Balance $ 1 504 89 I concur in the above recommendation and recommend further that the balance of $1,504.89, or so much thereof as may be necessary, be assigned for engineering services on the basis of four percent of the contract cost of the work handled—three percent of which is for preparation of plans and specifications and one percent for supervision of the work $1,504.89. O n m o t i o n of M r s . Grigsby, the contracts o n pages i a n d 2 (#44,969.01) w e r e authorized. O n m o t i o n of M r . A r m s t r o n g , the contract with the Davis C o n struction C o m p a n y (page 4) w a s authorized. O n motion of M r s . E v a n s , the item for engineering services (#1,504.89) w a s approved. O n m o t i o n of D r . N o b l e , the items o n page 3 (#19,101.17) were authorized, not to exceed the estimates listed.

LIGHTING FIXTURES FOR WOMAN'S GYMNASIUM

(18) The Supervising Architect submits the following schedule of quotations secured on lighting fixtures for the Woman's Gymnasium: Middle States Electric C o $ 985 76 Graybar Electric Co 1 078 30 McClellan-McDonough C o 1 '34 64 Hughes-Krabbe C o 1 200 50 Westinghouse Electric C o Walter Electric Supply GeneralG. Warren & C o Corp 1 3°7 °9 47° 25 203 14