|
| |
Caption: Board of Trustees Minutes - 1994 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1996] UNIVERSITY OF ILLINOIS 515 (The student advisory vote was: Aye, Mr. Malone, Mr. Mathew, Mr. Rose; no, none.) Increase in Project Budget; and Award of Contracts for Remodeling Fourth Floor, Newmark Laboratory, Urbana (14) The original $2,030,000 project for remodeling the fourth floor of Newmark Civil Engineering Laboratory at the Urbana campus was to reconfigure approximately 15,400 square feet of laboratories and ancillary space on the fourth floor for Environmental Engineering. The proposed remodeling included new partitions, flooring, laboratory casework, fume hoods, laboratory services, mechanical systems, lighting, and electrical upgrades. During the contract documents phase of the project, the campus requested the scope of the project be increased to include horizontal piping on the third floor of the building, extensive ceiling work, specific plumbing fixtures, ceiling tile and lights in the fourth floor corridor, security walls and doors, a cylinder storage room, environmental control rooms, asbestos abatement, and certain fixed equipment requirements. The cost of the additional work is estimated to be $945,000 for a total of 16,400 square feet of space on the fourth floor and mechanical support space on the third floor. Accordingly, the president of the University, with the concurrence of the appropriate University officers, recommends that the project budget be increased by $945,000 from $2,030,000 to $2,975,000. In addition, competitive bidding in accordance with the Illinois Purchasing Act was followed and award of the following contracts for the project is also being recommended. The award in each case is to the lowest responsible bidder on the basis of its base bid plus acceptance of the indicated alternate. Division I — General Ore W. Vacketta 8c Sons, Danville Base Bid Alt. G-l 1 . . . . $899 500 22 890 $ Division II — Plumbing A & R Mechanical Contractors, Inc., Urbana Division III — Heating Reliable Plumbing and Heating, Savoy Division IV — Ventilation A 8c R Mechanical Contractors, Inc., Urbana Division W — Electrical Potter Electric, Urbana Total 922 390 Base Bid 388 000 Base Bid 168 110 Base Bid Base Bid 292 000 296 400 $2 066 900 Funds are available from a National Science Foundation grant, private gift funds, and the Institutional Funds Operating Budget of the College of Engineering. A schedule of the bids received has been filed with the secretary of the board for record. Alternate G-l: Assignment of other contracts to the contractor for general work.
| |