UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1992 [PAGE 335]

Caption: Board of Trustees Minutes - 1992
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 335 of 628] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1993]

UNIVERSITY OF ILLINOIS

323

Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mr. Boyle, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Employment of Engineers, Energy Conservation Projects, Chicago

(34) The University has been awarded Federal energy conservation grants for academic facilities at the Chicago campus under the Cycle VI, Cycle VIII, and Cycle XI Energy Conservation Programs. It is now desirable to request the Capital Development Board to employ engineers for the energy projects totalling $1,629,224 of which $814,612 will be matching general revenue funds. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the Board of Trustees request the Capital Development Board to employ engineers for the projects listed below. The professional fee for each firm employed will be negotiated by the Capital Development Board in accordance with its procedures. Project Cycle VI: Convert 1,815 fixtures to T8 with reflectors, College of Medicine Cycle VIII: Convert 1,362 fixtures to T8 with reflectors, College of Pharmacy 213 points energy management system with start-stop, Clinical Sciences Building 148 points energy management system with start-stop, Associated Health Professions Building Cycle XI: Redesign of fluorescent fixtures, Science and Engineering Laboratories Redesign of fluorescent fixtures, Science and Engineering South Redesign of fluorescent fixtures, Architecture and Art Laboratories Redesign of fluorescent fixtures, Chemical Engineering Building Redesign of fluorescent fixtures, College of Dentistry Building Project Budget $186 692 Professional Firm Recommended R. T. Williams & Associates, Inc., Chicago O&N Engineering-Development, P.C., Chicago (Minority-Owned Firm) O&N Engineering-Development, P C , Chicago (Minority-Owned Firm) R. T. Williams & Associates, Inc., Chicago O&N Engineering-Development, P C , Chicago (Minority-Owned Firm) O&N Engineering-Development, P C , Chicago (Minority-Owned Firm) O&N Engineering-Development, P C , Chicago (Minority-Owned Firm) O&N Engineering-Development, P C , Chicago (Minority-Owned Firm) O&N Engineering-Development, P C , Chicago (Minority-Owned Firm)

153 032

208 000

160 118

361 024

233 015

47 022 13 236 267 085

On motion of Ms. Reese, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mr. Boyle, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)