|
| |
Caption: Board of Trustees Minutes - 1990 This is a reduced-resolution page image for fast online browsing.
![](https://uihistories.library.illinois.edu/REPOSITORYCACHE/16/BbQ7wkKuM7dn4i5g146mkLMU0l5e44K97OTaST452833x2Kt6VTTyU4FU9Fc48u1fOQ7zp0kg8GA96Bax7wF1n89dCk8Gp5Pd1r30daa8JPL_3486-86.jpg)
EXTRACTED TEXT FROM PAGE:
1990] UNIVERSITY OF ILLINOIS 75 Projects HVAC improvements, Phase II, Psychology Laboratory Ventilation improvements, Morrill Hall and Burrill Hall Roof replacement, Foreign Languages Building Elevator r e p l a c e m e n t , H e n r y A d m i n i s t r a t i o n Building and Chemical Annex Roof r e p l a c e m e n t , Education Building Acacia remodeling for GSLIS Bevier/Turner remodeling Davenport Hall, second floor, east wing Education Building, basement remodeling Library, enclose stairways Fiscal Year 1991 Professional Firm Project Budget Recommended $310 000 Henneman, Raufeisen and Associates, Inc., Champaign 350 000 S & R Engineers, Inc., Urbana 265 000 370 000 Severns, Reid 8c Associates, Inc., Champaign ESCA Consultants, Urbana 280 000 750 000 500 000 750 000 300 000 360 000 Clark Dietz, Inc., Champaign Architectural Spectrum, Champaign Phillips Swager Associates, Peoria Severns, Reid 8c Associates, Inc., Champaign Glerum Wachter Architects, Champaign Unteed, Scaggs, Nelson, Ltd., Champaign Funds for employment of the professional firms have been appropriated to the Capital Development Board for FY 1991. O n motion of Mrs. Calder, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mrs. Gravenhorst, Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Mr. Grabowski, Governor T h o m p s o n . (Mr. H a h n asked to be recorded as not voting on this item.) ( T h e student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.) Employment of Architect/Engineer, Temple Hoyne Buell Hall, Urbana (34) On July 12, 1990, the board approved the employment of Perkins 8c Will, Chicago, to provide the professional services required through the program analysis/ concept development phase of the Temple Hoyne Buell Hall project at the Urbana campus. In order for the project to proceed, it is now necessary to employ the architect/ engineer for the professional services required through the bidding phase of the project. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the firm of Perkins 8c Will, Chicago, be employed for the professional architectural and engineering services required through the receipt of bids at a fixed fee of $667,440, plus authorized reimbursements estimated to be $117,400. Funds are available from private gift funds through the University of Illinois and from funds appropriated by the State of Illinois. Upon receipt of satisfactory bids, the board will be asked to approve construction contracts and to employ the architect/engineer through the construction phase of the project.
| |