Caption: Board of Trustees Minutes - 1990 This is a reduced-resolution page image for fast online browsing.

EXTRACTED TEXT FROM PAGE:
1992] UNIVERSITY OF ILLINOIS 561 Division II — Plumbing Nogle & Black Mechanical, Inc., Urbana Division III — Electrical Glesco Electric, Inc., Urbana Total Base Bid Base Bid $ 5 870 4 836 $216 356 It is further recommended that the contracts for plumbing and electrical work be assigned to the contractor for general work (alternate G-l). Funds are available from the Fiscal Year 1993 Auxiliary Facilities System Repair and Replacement Reserve Fund. A schedule of the bids received has been filed with the secretary of the board for record. The project consists of the removal and replacement of the north wall at Memorial Stadium (commonly known as Zuppke Wall). The original wall was constructed without expansion joints which has created a number of cracks in the wall. This work would rebuild the wall with expansion joints to prevent future cracking. On motion of Mr. Boyle, these contracts were awarded by the following vote: Aye, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shephard; no, none; absent, Dr. Bacon, Governor Edgar. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.) President's Report on Actions of the Senates Establishment of a Minor in Food and Process Engineering, College of Engineering, Urbana (49) The Urbana-Champaign Senate has approved a proposal to establish a Minor in Food and Process Engineering which will be available to students enrolled in all undergraduate majors in the College of Engineering. This interdisciplinary minor will provide specialized training in food processing techniques; the demand for engineers with such training is increasing as processing techniques become more sophisticated. Completion of the minor will involve twelve semester hours of required courses, four semester hours of related electives, and completion of an internship at a food, pharmaceutical, or related processing company. This report was received for record. Comptroller's Quarterly Report of Contracts Executed (50) The comptroller submitted the quarterly report of contracts. The report included contractual agreements for payments to the University in amounts of $50,000 or more and for payments made by the University for subcontracts under sponsored research agreements. A copy of this report is filed with the secretary. This report was received for record. Quarterly Report of the Comptroller (51) The comptroller presented his quarterly report as of March 31, 1992. A copy has been filed with the secretary of the board. This report was received for record.
|