|
| |
Caption: Board of Trustees Minutes - 1990 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
554 BOARD OF TRUSTEES [May 14 $ 138 000 (1 900) 11 405 $ 147 505 168 600 Bid Item 14 — Painting Treat Brothers Company, Urbana Base Bid Alt. 8 Alt. 9 Bid Item 15 — Acoustical Ceilings Treat Brothers Company, Urbana Bid Item 16 — Windows and Entrances Brooks Plate Glass Company, Inc., Indianapolis, Indiana Base Bid Base Bid Alt. 5 297 900 6 810 304 710 Bid Item 17 — Elevators Montgomery Elevator Company, Peoria Bid Item 18 — Plumbing Commercial Mechanical, Inc., Dunlap Bid Item 19 — Heating and Temperature Control Nogle 8c Black Mechanical, Inc., Urbana Bid Item 20 — Ventilating Nogle 8c Black Mechanical, Inc., Urbana Bid Item 22 — Electrical Hatfield Electric Company, Peoria Total Base Bid 284 884 Base Bid 313 000 Base Bid 1 187 490 Base Bid 973 870 Base Bid 1 685 000 $10 232 888 Funds are available from private gift funds through the University of Illinois Foundation and institutional funds of the Urbana campus. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record. (The construction began March 1992 and is scheduled to be completed by November 1993; additional recommendations for award of site development and landscaping, custom fixed furnishings, carpet and resilient flooring, and telecommunications/network equipment and wiring construction contracts will be considered by the board on November 12, 1992.) On motion of Mr. Boyle, these contracts were awarded by the following vote: Aye, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Dr. Bacon, Governor Edgar. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)
| |