|
| |
Caption: Board of Trustees Minutes - 1990 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1992] UNIVERSITY OF ILLINOIS 519 and interior remodeling of approximately 20,000 gross square feet. The addition will occur on three sides of the existing building and will directly abut the existing exterior walls. The remodeling will occur on all levels of the existing building and includes extensive mechanical/electrical work associated with the existing systems. On motion of Ms. Reese, these recommendations were approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Mr. Grabowski. (Governor Edgar asked to be recorded as not voting on this item.) (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.) Contracts, Common Area Improvements, Allen Hall, Urbana (15) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for common area improvements in Allen Hall at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the alternates indicated. Division I — General Grunloh Construction, Effingham Base Bid Alt. G-l Alt. G-2 $334 580 2 889 28 880 $366 349 Division II — Plumbing A 8c R Mechanical Contractors, Inc., Urbana Division III — Heatingy Piping, Refrigeration, and Temperature Control A & R Mechanical Contractors, Inc., Urbana Division TV — Ventilation and Air Distribution A & R Mechanical Contractors, Inc., Urbana Division V — Electrical Witte Electric Co., Champaign Total Base Bid 35 270 Base Bid 113 800 Base Bid Base Bid 37 900 101 890 $655 209 It is further recommended that the contracts, other than the contract for general work, be assigned to the contractor for general work. Funds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond issue. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record. The project consists of interior remodeling, including new walls, floors, ceilings, lighting, and air conditioning for approximately 16,000 square feet of floor area. On motion of Ms. Reese, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none;
| |