On motion of Mr. Boyle, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Governor Edgar, Mr. Grabowski, Mrs. Gravenhorst. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Increase in Contract, Memorial Stadium Restoration, Urbana (Report of the President's Action)

(17) On October 10, 1991, the Board of Trustees authorized the award of a contract for $5,415,000 to Petry-Kuhne Company/Jones-Blythe Construction Company, Springfield, for the demolition and general work for the Memorial Stadium restoration project. During the contemplated demolition of the rear balcony masonry wall, it was discovered that the top flanges of many of the concealed steel wall support beams had deteriorated due to years of moisture penetration. The architect has recommended that the flanges be repaired. The cost of the work is $43,923. In order that the project not be delayed, it was essential that this work be undertaken immediately. Accordingly, the president authorized an increase in the contract of Petry-Kuhne Company/Jones-Blythe Construction Company, Springfield, in the amount of $43,923. In accordance with the General Rules Concerning University Organization and Procedure, the president reports his action and requests confirmation of it. Funds for this increase are available from the project proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond issue.

This report was received and confirmed by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Governor Edgar, Mr. Grabowski, Mrs. Gravenhorst. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Employment of Architect/Engineer, Public Safety Building, Urbana

(18) The president of the University, with the concurrence of the appropriate administrative officers, recommends the firm of Fischer-Wisnosky Architects, Inc., Springfield, be employed to provide the professional architectural/engineering services required through the bidding phase for the Public Safety Building project at the Urbana campus. The firm's fee for the professional services required for the program definition, concept development, and schematic design phases of the project will be on an hourly rate basis, the total not to exceed $61,710; the firm's fee for the design development, contract documents, and bidding phases will be a fixed fee of $99,400. Reimbursements are estimated to be $20,000. The proposed $2,700,000 project consists of the construction of an approximate 20,000 gross square foot facility to house the University Police and the Division of Campus Parking and will incorporate administrative offices and conference space for both units as well as other related requirements for the University Police. Funds are available initially from the Institutional Funds budget of the Urbana campus and the Division of Campus Parking. A schedule of the firm's hourly rates has been filed with the secretary of the board for record.