420

BOARD OF TRUSTEES $ 315 000 325 000 484 400 300 000 96 100 484 400 150 000 450 000 122 000 250 000 144 000 300 000 179 000

[November 14

Gregory Hall — enclose stairways Chicago: RRC Instrument Shop Facility Pharmacy — remodel for medicinal chemistry Organic Chemistry Lab. Masonry repairs and window replacement College of Medicine — Research Lab. remodeling CAHP — remodel Research Labs Rms. 124 and 125 Physical Plant — a u t o m a t e 3 passenger elevators New seating — Lecture Center Code corrections — west campus Elevator repair — Roosevelt Road Building Elevator repair — AHPB Tuckpointing — Roosevelt Road & Behavioral Sciences

Rettberg-Gruber, Champaign Larsen-Wulff & Associates, Inc., LaGrange Teng 8c Associates, Inc., Chicago Larsen-Wulff 8c Associates, Inc., LaGrange Larsen 8c Darby, Chicago John Victor Frega Associates, Ltd., Chicago John Victor Frega Associates, Ltd., Chicago Donohue & Assocs., Inc., Chicago ODI, Des Plaines Castro-Buchael, Chicago Donovan Engineers, Inc., Chicago Donohue 8c Assoc, Inc., Chicago Berheim Kehn, Chicago

Funds for employment of the professional firms have been appropriated to the Capital Development Board for FY 1991.

On motion of Mr. Boyle, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Governor Edgar, Mr. Wolff. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Employment of Architect/Engineer, Remodeling, Phase II, Mechanical Engineering Laboratory, Urbana

(22) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of the firm of BLDD Architects, Decatur, for the professional architectural and engineering services required for a $1.3 million project in the Mechanical Engineering Laboratory at the Urbana campus. T h e remodeling consists of constructing an intermediate floor in a high bay area between Engineering Research Laboratory and the main Mechanical Engineering Laboratory. T h e space created will provide approximately 6,000 gross square feet of design laboratories for the Aeronautical Engineering Department presently located in Aero Lab "B." T h e firm's fee for the professional services required for the design and bidding phases will be a fixed fee of $81,400 plus reimbursements estimated to be $20,000. Funds are available from the Institutional Funds operating budget of the College of Engineering.

On motion of Mr. Boyle, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Governor Edgar, Mr. WolfF.