UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1990 [PAGE 43]

Caption: Board of Trustees Minutes - 1990
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 43 of 648] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1990]

UNIVERSITY OF ILLINOIS

31

Be It, and It Hereby Is, Further Resolved that the Comptroller, with attestation by the Secretary, is authorized to execute, acknowledge, and deliver in the name of and on behalf of the Board of Trustees of the University of Illinois a lease and such other documents as said officers deem necessary or desirable to lease the abovedescribed property to First National Bank of Chicago in accordance with the terms of this resolution in order to enable the construction of the building for Area Studies and International Programs. O n motion of Ms. Reese, these r e c o m m e n d a t i o n s were approved a n d t h e foregoing resolution was a d o p t e d by t h e following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Ms. Reese, Mrs. S h e p h e r d , Mr. Wolff; n o , n o n e ; absent, Mr. Boyle, G o v e r n o r T h o m p s o n . (Mr. H a h n asked to b e r e c o r d e d as not voting on this item.) ( T h e student advisory vote was: Aye, Mr. Forbes, Ms. Kelly; n o , none.) Employment of Architect/Engineer, Temple Hoyne Buell Hall, Urbana (39) In October 1989, Temple Hoyne Buell donated $6 million to the University of Illinois for the design and construction of a new building for the School of Architecture, Department of Landscape Architecture, and the Department of Urban and Regional Planning at the Urbana campus. In addition to the gift, the 86th General Assembly appropriated $6 million to the University for this project. T h e proposed $12 million project will contain approximately 75,000 gross square feet and incorporates studios, a lecture hall, exhibit spaces, conference and seminar spaces, and faculty and administrative offices. T h e president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of Perkins & Will, Chicago, to provide the architectural/engineering services required through the program analysis/concept development phase of the project at a fee not to exceed $60,400, plus authorized reimbursements estimated to be $17,100. O n motion of Ms. Reese, this r e c o m m e n d a t i o n was approved by t h e following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Grabowski, Mrs. G r a v e n h o r s t , Ms. Reese, Mrs. S h e p h e r d , Mr. Wolff; n o , n o n e ; absent, Mr. Boyle, G o v e r n o r T h o m p s o n . (Mr. H a h n asked to be r e c o r d e d as not voting on this item.) ( T h e student advisory vote was: Aye, Mr. Forbes, Ms. Kelly; n o , none.) Employment of Architect/Engineer, Roof Replacement, Foreign Languages Building, Urbana (40) Among renovation and repair projects for the University of Illinois to be funded through the "Build Illinois" program is the replacement of the roof of the Foreign Languages Building on the Urbana campus. This project involves removing the built-up roof and insulation down to the main deck on all three roofs (25,000 square feet), and installing a new vapor barrier, insulation, and a roofing membrane. In order to keep the project on schedule, it is desirable that the architect/ engineer be employed to complete the design at this time in order that construction contracts may be awarded next spring. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the Board of Trustees request the Capital Development Board to emply Severns, Reid 8c Associates, Inc., Champaign,