1990]

UNIVERSITY OF ILLINOIS

27

Division V — Electrical Coleman Electrical Service, Inc., Mansfield .. Base Bid Division VI — Fire Protection McDaniel Fire Systems, Champaign Base Bid

$

565 520 23 766

Division VII — Asphalt Paving and Tennis Court Surfacing Champaign Asphalt Company, Urbana, and University Asphalt Company, A Division of Apcon Corp., Urbana, a joint venture . . . . Base Bid . . . Alt. 4 Total

$381 024 32 139 413 163 $4 362 604

It is further recommended that all contracts, other than the contract for general work, be assigned to the contractor for general work. It is also recommended that the project architect, Unteed, Scaggs, Nelson, Ltd., Champaign, be employed for the architectural/engineering contract administrative services required during the construction phase on a fixed-fee basis of $54,686; and to provide the required on-site observation on an hourly basis, estimated at $46,000 plus authorized reimbursements estimated to be $13,000. Funds are available from private gift funds and from operating funds of the Division of Intercollegiate Athletics and the Division of Campus Recreation. A schedule of the bids received and the architect's hourly rate schedule have been filed with the secretary of the board for record. T h e project consists of an approximately 58,000 gross square feet indoor facility containing six tennis courts, men's and women's teams' and public locker rooms, meeting rooms, mechanical and electrical space, and an outdoor facility containing eight lighted tennis courts, parking, and necessary site infrastructure.

O n motion of Ms. Reese, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mrs. Shepherd, Mr. Wolff; no, none; absent, Mr. Boyle, Governor T h o m p s o n . (Trustees H a h n and Reese asked to be recorded as not voting on this item.) ( T h e student advisory vote was: Aye, Mr. Forbes, Ms. Kelly; no, none.) Contracts, Air Conditioning, Intramural-Physical Education Building, Urbana

(34) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for air conditioning, Phase I, in the Intramural-Physical Education Building at the Urbana campus. T h e award in each case is to the lowest bidder plus acceptance of the indicated alternates. Division I — General W. Commercial Builders, Inc., Champaign Division II — Heating, Piping, Refrigeration, and Temperature Control Commercial Mechanical, Inc., Dunlap Base Bid $ 82 753

Base Bid .. $492 700 Alt. 1 7 300 500 000