UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1990 [PAGE 361]

Caption: Board of Trustees Minutes - 1990
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 361 of 648] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1991]

UNIVERSITY OF ILLINOIS

349

Table 2 Fiscal Year 1993 Capital Budget Proposal Chicago Campus (Dollars in Thousands)

Priority 1 2 3 4 5 6 7 8 9 10 Project Title NPI Remodeling/Neurosurgery Revitalization of Campus Core Phase II Repair and Renovation* Associated Health Professions Building Pharmacy Building Instructional Space Addition — AAB Chemistry Building College of Business Administration Science and Engineering Library College of Medicine West Building Category Remd. Remd. Remd. Remd. Remd. Plan. Plan. Plan. Plan. Remd. Request $5 500.0 3 500.0 4 500.0 9 485.8 1 720.0 917.9 1 831.8 1 339.4 1 384.6 9 864.3 Cumulative Cost $ 5 500.0 9 000.0 13 500.0 22 985.8 24 705.8 25 623.7 27 455.5 28 794.9 30 179.5 40 043.8

* Repair and Renovation projects include 18 projects at Chicago.

Table 3 Fiscal Year 1993 Capital Budget Proposal Urbana-Champaign Campus (Dollars in Thousands)

Priority Project Title 1 Repair and Renovation* 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 North Campus Development Commerce Instructional Facility** English Building Remodeling Phase IV Mechanical Engineering Lab. Remd. Agriculture Replacement Land Library Seventh Stack Addition Equipment-CSRL Freer Hall Remodeling Abbott Power Plant Improvements N.E. Campus Energy Center Planning Electrical Engineering Building FY 1993 Minor Remodeling Old Ag. Engineering Bldg. Remd. Arcade Building Remodeling Central Campus Chiller Plant Geology Laboratory Campus Site Improvements Engineering Hall Remodeling Armory Renovation Core Campus Land Category Request Remd. $ 6 147.0 Remd./ Util. 300.0 Bldg. 6 950.0 Remd. 4 250.0 Remd. 4 900.0 Land 1 400.0 Bldg. 19 300.0 Equip. 500.0 Remd. 5 200.0 Util. 2 340.0 Plan. 850.0 Plan. 1 950.0 Remd. 3 853.0 Plan. 220.0 Plan. 250.0 Util. 700.0 Plan. 925.0 Site 040.0 250.0 Plan. 260.0 Plan. 073.0 Land Cumulative Cost $ 6 147.0 14 21 25 30 31 51 51 56 59 60 62 65 66 66 72 73 74 74 74 76 447.0 397.0 647.0 547.0 947.0 247.0 747.0 947.0 287.0 137.0 087.0 940.0 160.0 410.0 110.0 035.0 075.0 325.0 585.0 658.0

* Repair and Renovation projects include 19 projects at Urbana-Champaign. ** This project includes gift funds of $6.95 million for a total project cost of $13.9 million.