UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1990 [PAGE 314]

Caption: Board of Trustees Minutes - 1990
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 314 of 648] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



302 I recommend approval.

BOARD OF TRUSTEES

[June 13

O n motion of Mr. Boyle, this r e c o m m e n d a t i o n was approved by t h e following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. L a m o n t , Ms. Reese, Mrs. S h e p h e r d , Mr. Wolff; no, n o n e ; absent, G o v e r n o r Edgar. ( T h e student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.) Purchases (33) T h e president submitted, with his concurrence, a list of purchases recommended by the directors of purchases and the vice president for business and finance. T h e purchases were presented in two categories: purchases from appropriated funds (i.e., from State appropriations to the University); and purchases from institutional funds. T h e latter term designates funds received by the University under contracts with the United States government, private corporations, and other organizations; grants from foundations, corporations, and other donors; and University revolving funds authorized by law. T h e total amounts of these purchases were: From Appropriated Funds Recommended From Institutional Funds Recommended Grand Total $ 929 901

14 978 174 $15 908 075

A complete list of the purchases, with supporting information (including the quotations received), was sent to each member of the board in advance of the meeting. A copy is being filed with the secretary of the board for record. O n motion of Mr. Boyle, t h e purchases r e c o m m e n d e d were a u t h o r ized by t h e following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. L a m o n t , Ms. Reese, Mrs. S h e p h e r d , Mr. Wolff; n o , n o n e ; absent, G o v e r n o r Edgar. ( T h e student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.) Increase in Architectural/Engineering Contract, Temple Hoyne Buell Hall, Urbana (34) In July and September 1990, the Board of Trustees authorized the employment of Perkins 8c Will, Chicago, to provide the architectural/engineering services required from the program analysis through the bidding phase of the Temple Hoyne Buell Hall project at the Urbana campus. T h e original program contemplated that the building's air-conditioning requirements would be satisfied from an existing library air-conditioning center source. Subsequently, the program requirements have been revised to require year-round air conditioning which can best be satisfied from self-contained air-conditioning facilities. This change in program will not impact the construction budget but will require additional architectural/engineering fees for the professional services required to design the facilities. T h e cost of those services through the bidding phase will be provided on a lump-sum basis of $40,000. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the contract with Perkins 8c Will, Chicago, be increased by $40,000 to provide the services as described above. Funds are available from private gift funds through the University of Illinois and from funds appropriated by the State of Illinois.