Caption: Board of Trustees Minutes - 1990 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1991] UNIVERSITY OF ILLINOIS 293 Division HI — Heating, Refrigeration, and Temperature Control Reliable Plumbing & Heating Company, Champaign Division IV — Ventilation and Air Distribution T ' n T Mechanical, Urbana Base Bid Base B i d . . . Alt. V - 4 . . . . $ 21 119 820 $ 27 250 21 939 Division V — Electrical Central Illinois Electric Company, Pesotum .. Base Bid Division VI — Sprinkler Harshman Plumbing & Heating Co., Sullivan Total 108 900 Base Bid 13 843 $568 669 It is further recommended that the contracts, other than the contract for general work, be assigned to the contractor for general work. T h e project is to remodel approximately 12,600 square feet of existing space to develop a Student Activities Center containing nine offices, four meeting rooms, four open plan work stations, nine work tables, a reception area, new men's and women's restrooms, a reception station, a photocopy center, a storage room, and a vending area. Funds are available in the Auxiliary Facilities System Repair and Replacement Reserve account and from the Restricted Funds operating budget of the Illini Union. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record. O n motion of Mr. Boyle, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Governor Edgar. ( T h e student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.) Contracts, Minor Building Alterations, Repairs, and New Construction, Chicago (23) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following cost-plus contracts for minor building alterations, repairs, and new construction at the Chicago campus for the fiscal year ending June 30, 1992, the awards being made to the lowest responsible bidders. T h e University has the option to extend the contracts from July 1, 1992, to June 30, 1993, and from July 1, 1993, to June 30, 1994, under the same terms and conditions, subject to approval by the Board of Trustees. T h e contractors bid on percentages to be added to an estimated volume of material, labor, and subcontractors. Percent for Material General J. L. Burke Contracting, Inc., Chicago Percent Percent Total for for Estimated Fee Labor Subcontractors Payments 0.5 33.0 5.25 $ 69 375
| |