1990]

UNIVERSITY OF ILLINOIS

133

the following vote: Aye, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mrs. Gravenhorst, Mr. H a h n , Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Dr. Bacon, Governor T h o m p s o n . ( T h e student advisory vote was: Aye, Mr. Forbes, Ms. Kelly; no, none.) Dual Fuel Cogeneration Power Plant, Chicago

(21) In April 1989 and June 1990, the Board of Trustees approved recommendations concerning the design and financing of a dual fuel cogeneration plant at the Chicago campus. Following these actions, appropriate design construction and equipment procurement actions were initiated subject to appropriate approvals of the Illinois Environmental Protection Agency (IEPA). On September 27, 1990, the IEPA published for public comment the draft of a permit required for this project. T h e comment period ended October 27, 1990, without challenge to the project. Pending conclusion of discussions between State and Federal environmental agencies, the IEPA is expected to award a construction permit. Accordingly, the president of the University now recommends that the comptroller be authorized: 1. To enter into the appropriate lease and sublease of University property (for the greater of seven years or the termination of the lease/purchase agreement previously authorized) with the trustee as described in the following board resolution. 2. To employ Consoer, Townsend & Associates, Inc., for the architectural/ engineering professional services required during the construction phase on a fixed fee of $134,000; and for the professional services required for site observation on an hourly basis, not to exceed $55,000, subject to the availability of funds from the sale of certificates. 3. Award the following contracts for construction of the dual fuel cogeneration power plant at the Chicago campus. T h e award in each case is to the lowest base bidder, plus acceptance of the alternate indicated. Division I — General John Burns Construction Company, Orland Park .. Base B i d . . . . $2 120 000 Alt. G-l . . . . 122 286 Division II — Plumbing Economy Mechanical Industries, Inc., Wheeling . . . Base Bid. . . . 234 000 Division III — Heating, Refrigeration, and Temperature Control Voris Mechanical, Inc., Glendale Heights Base Bid 2 692 800 Division IV — Ventilation and Air Distribution Abbott and Associates, Inc., Bloomingdale Division V — Electrical Hatfield Electric Company, Rosemont Total Base B i d . . . . Base Bid 162 400 987 000 $6 318 486

T h e award of each of these contracts is subject to availability of funds derived from the sale of the certificates. 4. Assign the construction contracts other than the contract for general work to the contractor for general work. 5. Purchase certain electrical generating equipment from Ideal Electric Company for $692,932 subject to availability of funds derived from the sale of the certificates.