|
| |
Caption: Board of Trustees Minutes - 1918 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1916] UNIVERSITY OF ILLINOIS II 1. LAND, BUILDINGS, EQUIPMENT, RECONSTRUCTION, AND REPAIRS 1. Land and building assignments carried forward from 1915-16 - $ 73,407.07 2. Buildings and Equipment A. Projects in progress (1) Women's Residence Hall and furnishings $100,000.00 (2) Mechanical Engineering laboratory reconstruction 30,000.00 (3) Ceramics building and equipment... 192.05 (4) Chemistry laboratory and equipment 37,048.58 (5) Vivarium and equipment 25,753.34 (6) Pharmacy building and equipment*.... 14,350.00 Total, projects in progress B. New projects (1) Education building and furnishings.... (2) Smith Memorial Music Hall (3) Cattle feeding plant (4) Horticultural field group Total, new projects 3. Sundry reconstructions 4. Furniture and fixtures Total, land, buildings, equipment, reconstruction, and repairs 207,343.97 60,000.00 75,000.00 25,000.00 40,000.00 200,000.00 20,000.00 10,000.00 $510,751.04 II. EXTENSION OF T H E PHYSICAL PLANT AND BUILDING BETTERMENTS Extension and betterments $ 40,000.00 III. PHYSICAL PLANT OPERATION AND MAINTENANCE 1. General Operation and Maintenance Undistributed salaries Heat, Light, and Power Building Operation Building Maintenance and Repairs W a t e r Station Fire Station Telephone Exchange Tools and Equipment Store Rooms Freight Handling $ 7,760.00 72,000.00 49,000.00 34,740.00 1,500.00 1,500.00 3,000.00 1,000.00 2,000.00 7,000.00 *In addition to the $14,350 here provided for the Pharmacy building and equipment, $16,650 for the same purpose is included in items 3 and 4 below (Sundry reconstructions and Furniture and Fixtures), and in I I below (Extension of the Physical Plant and Building Betterments).
| |