UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Book - Pictorial Guide to College of Engineering (1919) [PAGE 29]

Caption: Book - Pictorial Guide to College of Engineering (1919)
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 29 of 32] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



MAIN TRANSMISSION OF PRESSURE THROUGH SAND AND GRAVEL

f., %

LIBRARY

OF T H E

UNIVERSITY

OF

ILLINOIS

T H E load is applied to the gravel bed through a railroad tie by means of a screw jack. At various points in the gravel bed small metal boxes are buried, and these are connected with the dials shown projecting from the gravel bed at various points. The pressures in the gravel bed are transmitted to these boxes, and are indicated by the dials.

W

I

1 1 f i r i ' **• * 1

3

: "i^^rte^nA*"

*,ir&J0%m£*tef>"

MEASURING

FLOW

OF W A T E R

BY M E A N S

OF A VERTICAL

JET AND

ARMORY FOR

USED

FOR

HOUSING

EQUIPMENT UNIVERSITY

T H E amount of water flowing through a pipe may be determined if it is allowed to discharge into the air in a vertical direction through a plate with a circular hole in it. The height to which the jet rises is a measure of the quantity of water passing. MATERIALS TESTING AND HYDRAULICS WORK

TRAINING

QUARTERS CADET

FOR THE

CORPS

DURING the war this building was used by the United States Army; at first for training Aviators, and later for the Students' Army Training Corps.